General
Site name
Kebele Valley and Szentgyörgyvölgyi stream valley (Kebele patak/Kobiljski potok)
Summary
The Hungarian part of Kebele catchment with its 209 km2 size is located in the south-western corner of the country, in the West-transdanubian Water Directorate’s operational area, as part of the Drava sub-basin and Mura sub-unit.
About 60% of the area is agricultural land, typically with wheat, barley, corn cultivation and pasture management. The Kebele Valley and Szentgyörgyvölgyi stream valley is NATURA 2000 classified. Main challenges identified in the area: management of nitrate-sensitive areas, prevention and mitigation of soil erosion and flash floods.
The Hungarian-Slovenian cross-border water cooperation dates back to 1994.
OPTAIN seeks to identify efficient NSWRM to better adapt to extreme events (floods, droughts) and reduce conflicts between agricultural water uses and other human and environmental demands on water in small catchments across Europe in close cooperation with local actors.
About 60% of the area is agricultural land, typically with wheat, barley, corn cultivation and pasture management. The Kebele Valley and Szentgyörgyvölgyi stream valley is NATURA 2000 classified. Main challenges identified in the area: management of nitrate-sensitive areas, prevention and mitigation of soil erosion and flash floods.
The Hungarian-Slovenian cross-border water cooperation dates back to 1994.
OPTAIN seeks to identify efficient NSWRM to better adapt to extreme events (floods, droughts) and reduce conflicts between agricultural water uses and other human and environmental demands on water in small catchments across Europe in close cooperation with local actors.
Project
Optain
Light or indepth?
Light
Transboundary
1
NWRM(s) implemented in the case study
Longitude
16.446351
Latitude
46.611518
Monitoring maintenance
Monitoring impacts effects
0
Design & implementations
Public consultation
0
Contractural arrangements
0
Design contractual arrangement
| Arrangement type | Responsibility | Role | Comments | Name |
|---|---|---|---|---|
Design consultation activity
| Activity stage | Key issues | Name | Comments |
|---|---|---|---|
Design land use change
| Land use change type |
|---|
Design authority
| Authority type | Role | Responsibility | Name | Comments |
|---|---|---|---|---|
Lessons, risks, implications...
Financing mechanism
0
Success factor(s)
| Success factor type | Success factor role | Comments |
|---|---|---|
Financing
| Financing type | Comments |
|---|---|
Driver
| Driver type | Driver role | Comments |
|---|---|---|
Financing share
| Financing share type | Share | Comments | |
|---|---|---|---|
Policy, general governance and design targets
Part of wider plan
0
Policy target
| Target purpose |
|---|
Policy pressure
| Pressure directive | Relevant pressure |
|---|---|
Policy area
| Policy area type | Policy area focus | Name | Comments |
|---|---|---|---|
Policy impact
| Impact directive | Relevant impact |
|---|---|
Policy wider plan
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
Policy requirement directive
| Requirement directive | Specification |
|---|---|