Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 91 results found

Sector

  • Hydro Morphology (82)
  • Forest (39)
  • Agriculture (29)
  • Urban (20)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Riverbed material renaturalization (40)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Stream bed re-naturalization (53)
  • (-) Meadows and pastures (29)
  • (-) Detention Basins (12)
Show more
Title Abstract Case study(ies)
Case study: LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica In 2006 Notranjska Regional Park acquired financial support from European programme LIFE †“ Nature for project LIFE 06. The purpose of this project was the establishment of appropriate conditions for protection and conservation of animal and plant species and their habitats on Lake Cerknica. Factors that threaten the biodiversity on Lake Cerknica are modified watercourses, abandoning of meadow mowing and deficient knowledge of nature and its conservation. Conservation on Lake Cerknica, Slovenia
ES2200035 Tramos Bajos del Aragon y del Arga Natura 2000 data set for lower reaches of the Aragon and Arga Rivers Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
El agua en navarra La política del agua está viviendo un profundo proceso de renovación en Europa. Esta política se fundamenta en los principios de la Directiva Marco del Agua, que obliga a una nueva planificación hidrológica. Los ejes de esta planificación pretenden favorecer el buen estado de las aguas al tiempo que garantizan su disponibilidad y su uso sostenible. Navarra está adaptando sus políticas al nuevo modelo europeo de gestión y administración del agua. Avanzar hacia una gestión más sostenible del agua requiere el compromiso y la corresponsabilidad de los diferentes agentes institucionales y sociales. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
River Órbigo Restoration Project Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) Órbigo River ecological status improvement, Spain
www.symasol.fr The website presents all the projects the SYMASOL is responsible for, particularly the Contrat de rivière in which frame this precise measure take place. Restoration of river Hermance, France
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. River basin management of the Ill, France
Pilootprojecten Stroomgebied Voer This presentation gives a short graphical overview of two executed NWRM's on the Horstergrub river less than one on the Belgian side of the border, one on the Dutch side of the border. The NWRM on the Belgian side of the border is the discussed NWRM. Horstergrub sediment management, Belgium
Réseau expérimental sur la réhabilitation de zones humides du Finistère. Prairie humide de Coat Carriou, St Evarzec. Bilan 2014-2016. Removal of drainage ditches on wet meadow on Coat Carriou
Aménagement des berges en génie végétal et mise en place de zones annexes sur la Scarpe canalisée à Arras Revitalisation of the Scarpe river by changing the riverbanks from grey to green infrastructure and connection of hydraulic annexes to enhance water storage. Revitalisation of riverbanks and connection of hydraulic annexes alongside the Scarpe river in France
Floodplains in Germany "Synergies with nature conservation, WFD and flood protection" Presentation at the Second Western Network Workshop on NWRM, July 2014, Strasburg, France. Dyke relocation on the river Elbe near Lenzen, Germany
Exemple d’une cogestion réussie sur un marais breton Restoration of the Black Marsh of Saint-Coulban
La nature mise en valeur The document is presenting the overal project (river restoration, extensiv agriculture development, etc.) and its impact on biodiversity. Alzette river restoration in Dumonshaff, Luxembourg
El Proyecto de mejora ecologica del rí­o Órbigo (tramo I) Article on the restoration project Órbigo River ecological status improvement, Spain
Weigall Road and Sutcliffe park Site description and details of dimensions of NWRM measures Restoring the River Quaggy in London, UK
ES2200035 -Tramos Bajos del Aragon y del Arga Natura 2000 data set for lower reaches of the Aragon and Arga Rivers Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Le jardin des eaux à Fourqueux, un projet de parc et une gestion de l’eau à l’échelle du centre-ville Jardin des Eaux (water garden) in Fourqueux, a water management system for the city centre
Sutcliffe Park Managment Plan - Draft Sets out the manner in which Sutcliffe Park should be managed. Restoring the River Quaggy in London, UK
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Die Deichrückverlegung bei Lenzen an der Elbe Interview with the project director. Dyke relocation on the river Elbe near Lenzen, Germany
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Documento 4 (Presupuesto). Project Report Órbigo River ecological status improvement, Spain
Effect of land development and forest management on hydrologic response in southeastern coastal wetlands: a review Land development activities such as agriculture, clear cutting, peat mining, and the planting of forest plantations on wetlands can affect the hydrologic behavior of these ecosystems by affecting their water storage and release patterns on the landscape. The effects of these development activities on hydrologic fluxes in peatlands (Typic Medisaprists) were compared to the effects of forest management practices in North Carolina using a field-tested hydrologic simulation model (DRAINMOD). Simulations revealed that natural peat-based (Histosol) pocosin systems lose 66% (80 cm) of the 123 cm of average annual rainfall by evapo-transpiration (ET) and 34% (42 cm/yr) via annual runoff. Annual runoff values were 63 cm/yr for peat mining areas, 48 cm/yr for cleared peatlands, 46 cm/yr for peatlands converted to agriculture and 34 cm/yr for pine plantations, once the forest canopy is closed. Thus, these wetland alterations, except for forestry, significantly increased runoff and decreased ET compared to the natural ecosystem. Forest pine plantation management decreased runoff and increased ET. A case study of the effects of forest management practices was reviewed for a 15-year-old drained loblolly pine plantation growing on fine sandy loam soils (Thermic Typic umbraquults) in the coastal plains of North Carolina. Forestry activities such as thinning (i.e., reduced leaf area index by 50%) decreased ET and canopy interception and nearly doubled drainage loss (38 cm/yr to 60 cm/yr). Commonly applied forest practices, such as drainage, increased the average number of flow events with flows > 5 mm/day to 86 days per year from 26 days per year under natural conditions. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
River Quaggy at Sutcliffe Park:Techniques: Re-meandering, backwater creation, de-culverting Summary note on the NWRM appraoch used at Sutcliffe Park and the associated benefits observed. Restoring the River Quaggy in London, UK
restauration écologique en montagne, Production et utilisation de mélanges pour la préservation, projet Alp’Grain Revegetation of the Vernie Rouge ski slope in the Alps
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Hochwasser: Rückverlegung des Deichs bewährt sich Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt.Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt. Dyke relocation on the river Elbe near Lenzen, Germany
LIFE+ Project Mink Territory The LIFE + MINK TERRITORY project is directed at restoring the river habitats along the lower reaches of the Aragón and Arga rivers in Navarre and at increasing the mink population there. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) The project included the widening of 3 section of the river and the reconstruction of an open check dam. Revitalization of the upper Drau River in Austria
Plan Nacional de Restauracion de Rí­os Este Ministerio está desarrollando, en consonancia con la Directiva marco del agua y la Directiva de evaluación y gestión de los riesgos de inundación, la Estrategia Nacional de Restauración de Ríos, un conjunto de actuaciones con el fin de conservar y recuperar el buen estado de nuestros ríos, minimizar los riesgos de inundación, potenciar su patrimonio cultural, fomentar el uso racional del espacio fluvial e impulsar el desarrollo sostenible del medio rural.
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Arga. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
The Órbigo River Restoration Project and its implications in flood risk prevention WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18
April, 2012. Bucharest-Romania
Session 4: Working with institutional stakeholders and other sectors, in particular in land use
Órbigo River ecological status improvement, Spain
a river reborn: Restoring the Quaggy River and tackling flooding Summary of restoration work as part of flood alleviation scheme Restoring the River Quaggy in London, UK
La Seymaz Presentation of the Seymaz river and the renaturation project by Geneva Canton Renaturation of the Seymaz river, Switzerland
Sozio-ökonomische Betroffenheit der Landwirtschaft durch Deichrückverlegung im Bereich der brandenburgischen Mittelelbe unter Berücksichtigung betrieblicher Anpassungsmöglichkeiten Study on the socio-economic consequences for agriculture through the dyke relocation in the area of the Middle Elbe, taking operational adaptation measures into account. Dyke relocation on the river Elbe near Lenzen, Germany
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Aragon. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
NWRMs experience from Austria characterization of Austria's landcover, population density, topography and the traditional flood protection
National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned
Revitalization of the upper Drau River in Austria
Natural water retention for combined outcomes - the Arga-Aragon case study (Spain) Presentation from Fernando Magdaleno Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Lugares de importancia comunitaria: Tramos Bajos del Aragon y del Arga List of important places for biodiversity in Navarra Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Telephone Interview with Norbert Sereinig (project responsible) discussion on financial aspects, details of the monitoring programme and governmental aspects Revitalization of the upper Drau River in Austria
Guí­a técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 Órbigo River ecological status improvement, Spain
Ecological Improvement Project in the Órbigo River (Stretch I) ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. Órbigo River ecological status improvement, Spain
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 2: bilan technique et financier The reports presents the technical and financial results of the Contrat de rivière project Restoration of river Hermance, France
Changes in the functioning of wetlands along environmental gradients One of the prevalent gradients in wetlands is the continuum of depth and frequency of flooding. While much emphasis has been placed on the importance of hydrology as a driving force for wetlands, few other perspectives have emerged to demonstrate unifying patterns and principles. In contrast to the wetness continuum, the functioning of wetlands can be separated into two broad categories: (1) landscape-based transitions that occur within a wetland or group of similar wetland types and (2) resource-based transitions that allow comparisons of the flow of water and processing of nutrients among very different wetland types. Landscape-based continua include the transition from upstream to downstream in riverine wetlands and between aquatic and terrestrial ecosystems within a wetland. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Project web site Project web site contains the Detailed project presentation (summary, threats, purpose and goals, actions and achievements), Description of the project area, List of available documents, Newsletters, Didactic game, Contacts, ... Conservation on Lake Cerknica, Slovenia
Cerknisko Jezero - Intermittent Cerknica Lake, Project Description The project aimed to ensure long-term favourable conditions for the conservation of turloughs and other endangered habitat types and associated
plant and animal species at Lake Cerknica. It simultaneously sought to promote an even development of local agriculture, forestry, fishing, tourism, recreation and education in accordance with natural values.
Conservation on Lake Cerknica, Slovenia
TERRITORIO VISÓN - Recuperacion ambiental del Territorio Fluvial; espacio vital del vison europeo (Mustela lutreola) - LIFE09 NAT/ES/000531 El proyecto LIFE+ TERRITORIO VISÓN es un proyecto financiado por la Comisión Europea a través del Programa LIFE+ 2009 “Naturaleza y Biodiversidad”. Tiene por objeto la recuperación de los hábitats fluviales y la mejora de la biodiversidad de los tramos bajos de los ríos Arga y Aragón, lugares de importancia comunitaria (LIC) incluidos en la Red Natura 2000, y la zona de mayor densidad de población de visón europeo (Mustela lutreola) en Europa occidental, a la vez que optimiza la defensa contra inundaciones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Auenschutz - Hochwasserschutz - Wasserkraftnutzung. Beispiele für eine ökologisch vorbildliche Praxis Book describing a list of good practice examples of protection of floodplains, flood protection and hydropower use - mainly from Germany, Austria and Switzerland. Dyke relocation on the river Elbe near Lenzen, Germany
Kleinteilige Maßnahmen im Rahmen der „Gewässernachbarschaftstage“ in Hamburg Urbane Gewässer, Sohlstruktur, Kooperation Auch in den dicht besiedelten Bereichen einer Großstadt ist eine wirksame und kostengünstige Umsetzung der Ziele der Wasserrahmenrichtlinie möglich. An jeweils einem Gewässerabschnitt am Osterbek und der Mittleren Bille in Hamburg werden im Rahmen der „Gewässernachbarschaftstage“ die Gewässerbett- und Uferstruktur verbessert, um den Lebensraum für standorttypische Tier- und Pflanzengesellschaften aufzuwerten und eine größere Strukturvielfalt zu erreichen Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany
Sem’ les Alpes, Des semences d’origine locale pour la restauration de milieux ouverts en montagne alpine Revegetation of the Vernie Rouge ski slope in the Alps
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. River basin management of the Ill, France

Pagination

  • Next page ››

Funded by EU(link is external)
Service contract funded by the European Commission((Directorate General Environment)(link is external))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau(link is external) | Join the NWRM group on Join us in Linked In(link is external)

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18