Recueil d'expériences: les communaux du Marais Poitevin |
Experiences and results about the preservation fo the common floodmeadows |
Flood meadows in the Marais Poitevin, France |
Les Marais Communaux du Marais Poitevin |
Website presenting the project, with links to newsletters |
Flood meadows in the Marais Poitevin, France |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) |
Project Report |
Órbigo River ecological status improvement, Spain |
Coat Carriou, Saint Evarzec, 0.35 ha |
|
Removal of drainage ditches on wet meadow on Coat Carriou |
Etat des lieux – Document d’objectifs Natura 2000 Baie du Mont-Saint-Michel. |
|
Restoration of the Black Marsh of Saint-Coulban |
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 1: état des lieux initial et final |
The report presents the results of the Contrat de rivière project, which includes Heramnce restoration project. It details initial state and final state regarding indicators linked to water quality, hydromorphological status etc |
Restoration of river Hermance, France |
Action Plan for Renaturation of watercourses in the area of Cerknica Lake (Akcijski plan renaturacije vodotokov na obmoÄju Cerkniškega jezera) - available in Slovenian language |
The document consists of historical overview of developments at Cerknica Lake, changed water regime and its consequences, and detailed action plan for renaturation of watercourses of Cerknica Lake. |
Conservation on Lake Cerknica, Slovenia |
Erfolgreiche Feuchtgrünlandentwicklung durch Naturschutzmaßnahmen. Langfristige Veränderung von Flora, Vegetation und Avifauna am Beispiel des Ochsenmoores in der Dümmerniederung. |
NLWKN website |
Restoration of Wetlands in the Western Lowland Area of the Dümmer Lake, Germany |
Renaturation de la Seymaz |
report on technical issues of the Seymaz renaturation |
Renaturation of the Seymaz river, Switzerland |
W.A.T.E.R. Histoire d’une cooperation européenne autour des zones humides. |
|
Restoration of the Black Marsh of Saint-Coulban |
Tramos Bajos del Aragon y del Arga |
Factsheet filled with data from Natura 2000 data set |
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Landwirtschaftliche und touristische Nutzungsänderungen im Naturschutzgroßprojekt "Lenzener Elbtalaue" (2005 - 2009) Sozio-ökonomische Evaluierung (I) |
Project report |
Dyke relocation on the river Elbe near Lenzen, Germany |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). |
Project Report |
Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 5 (Estudio morfológico). |
Project Report |
Órbigo River ecological status improvement, Spain |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. |
|
Functional restoration of the valley of Saint Ruph-Glière-Eau Morte |
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 |
Overview on costs |
River basin management of the Ill, France |
Die Deichrückverlegung bei Lenzen an der Elbe |
Entire journal dedicated to the project, giving details in particular from a hydraulic perspective. |
Dyke relocation on the river Elbe near Lenzen, Germany |
Modelprojekt Holter-Hammrich |
As a secondary result of structures and buildings of flood water protection, NWRMs aiming at nature conservation can be implemented in the Holter-Hammrich Area. |
Holter-Hammrich Area - Flood Protection and Nature Conservation, Germany |
Terrains dégradés des stations de ski : la piste locale pour restaurer la biodiversité |
|
Revegetation of the Vernie Rouge ski slope in the Alps |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] |
Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration |
Órbigo River ecological status improvement, Spain |
Retours d’expérience sur la restauration de prairies humides |
|
Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain |
Small scale measures under the "Waters neighborhood Days" in Hamburg - Factsheet |
The core of the activities carried out on Osterbek river was the installation of flow control arms at mean water level.
Due to the width of the bundle of sticks of 2 to 2.5 m, they should contribute to a significant narrowing of the broad streambed. They were attached to three pegs that were fixed at the ground. In order to avoid under- or backflushing, the brushwood were strengthened with stones, coarse and fine gravel. A total of 14 flow control arms were installed at equal distances approximately transverse to the direction of flow on the left and right bank . In a wide section an island of gravel and coarse of about 15 m was applied.
Also in the Middle Bille flow control arms were installed consisting of dead wood, stones and gravel. The brushwood was shortened to a length of about 1 m and transversely and with a slight tilt attached to two pegs in the sole. The height of the installment was also based on mean water level |
Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany |
Les marais de Dol à la fin du XIIe siècle: essai géographique rétrospective |
|
Restoration of the Black Marsh of Saint-Coulban |
Notranjski regijski park, Layman's Report |
Layman's Report (project report intended for wider public) presents background, goals and purpose of the project, planned solutions, actions and result. At the end it describes the meaning and the message of the project. |
Conservation on Lake Cerknica, Slovenia |
Opération de restauration d’une roselière dans le marais noir de saint coulban. |
|
Restoration of the Black Marsh of Saint-Coulban |
LIFE Projekt Auenverbund Obere Drau |
Detailed project description of the former LIFE project on the river Drau. We needed basic information on the region e.g. rainfall, temperature, runoff |
Revitalization of the upper Drau River in Austria |
Les arrangements locaux et la durabilité de nouvelles activités rurales : le cas de la renaturation de la Haute-Seymaz (local arrangements and sustainability of new rural activities : the Haute-Seymaz renaturation case study) |
Study on renaturation in Switzerland based on the Seymaz river case and focuses on governance and local arrangements |
Renaturation of the Seymaz river, Switzerland |
Naturschutzgroßprojekt Lenzener Elbtalaue |
Website of the project. |
Dyke relocation on the river Elbe near Lenzen, Germany |
Case study: LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica |
In 2006 Notranjska Regional Park acquired financial support from European programme LIFE †“ Nature for project LIFE 06. The purpose of this project was the establishment of appropriate conditions for protection and conservation of animal and plant species and their habitats on Lake Cerknica. Factors that threaten the biodiversity on Lake Cerknica are modified watercourses, abandoning of meadow mowing and deficient knowledge of nature and its conservation. |
Conservation on Lake Cerknica, Slovenia |