Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 82 results found

Sector

  • Hydro Morphology (79)
  • Agriculture (29)
  • Forest (23)
  • Urban (8)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Stream bed re-naturalization (53)
  • Riverbed material renaturalization (40)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Buffer strips and hedges (27)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Removal of dams and other longitudinal barriers (32)
  • (-) Meadows and pastures (29)
  • (-) Lake restoration (24)
Show more
Title Abstract Case study(ies)
Natural Park of the Lower Prut Floodplain - Project LIFE 05 NAT/RO /000155 Description of the project. Ecological Restoration of Mata Radeanu, Romania
Restoration of Drained Mires (Å umava National Park, Czech Republic) About 70% of mires in the Šumava Mountains have been influenced by past drainage for variously forestry, agriculture and peat extraction. Since 1999, a comprehensive “Mire Restoration Programme” has been implemented in the Šumava National Park, primarily focused on the disturbed hydrology. The main restoration technique used has been the blocking of drainage ditches. Selected drained and intact mires were also monitored with the aim: (i) to characterise the degradation changes induced by the disturbed hydrology; and (ii) to evaluate the success of restoration. Water-table fluctuations, hydrochemistry of groundwater, surface-water outflow, amount of precipitation and the vegetation on permanent plots have been monitored. Pre-restoration monitoring data had shown differences between drained and intact sites. On drained bog sites, water tables were maintained at lower levels and exhibited higher fluctuations compared to intact sites. Expansion of the more competitive grasses and trees towards the bog expanse was recorded on drained bogs as well as expansion of dwarf shrub vegetation and reduction of Trichophorum lawns and hollow vegetation. Preliminary results from the initial post-restoration phase have shown a rise in the water table, stabilisation of the hydrological regime and some changes in hydrochemistry at restored sites.
Mire restoration within the Sumava National Park, Czech Republic
A MÓRAHALMI NAGYSZÉKSÓS-TÓ VíZKÉMIAI VIZSGíLATAINAK ELEMZÉSE Overview of the water quality monitoring results of the lake (HURO/0901/207/2.2.2 project) Water supply and rehabilitation in Nagyszeksos-to Southern Hungary
River Órbigo Restoration Project Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) Órbigo River ecological status improvement, Spain
Komplex ví­zvisszatartási akcioprogram a NagyszéksosTo ví­zrendszerében Enhancement of water supply of a former lake/wetland area to preserve ecologic circumstances. Redirection of surplus drainage water to the area and the creation of a sepatate wetland site to give extra cleaning to water received from the treated municipal wastewater treatement plan Water supply and rehabilitation in Nagyszeksos-to Southern Hungary
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. River basin management of the Ill, France
Pilootprojecten Stroomgebied Voer This presentation gives a short graphical overview of two executed NWRM's on the Horstergrub river less than one on the Belgian side of the border, one on the Dutch side of the border. The NWRM on the Belgian side of the border is the discussed NWRM. Horstergrub sediment management, Belgium
Réseau expérimental sur la réhabilitation de zones humides du Finistère. Prairie humide de Coat Carriou, St Evarzec. Bilan 2014-2016. Removal of drainage ditches on wet meadow on Coat Carriou
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park Project description; Environmental issues; Beneficiaries; Administrative data Ecological Restoration of Vlascuta Lake, Romania
Some aspects concerning wetland restoration programs in the Prut River Basin The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects Ecological Restoration of Pochina Lake, Romania
Floodplains in Germany "Synergies with nature conservation, WFD and flood protection" Presentation at the Second Western Network Workshop on NWRM, July 2014, Strasburg, France. Dyke relocation on the river Elbe near Lenzen, Germany
Exemple d’une cogestion réussie sur un marais breton Restoration of the Black Marsh of Saint-Coulban
LIFE FOR THE BOURGAS LAKE - Ensuring Conservation of Priority Bird Species and Coastal Habitats at the Bourgas Natura 2000 Wetland Sites The †œLife for the Bourgas lakes† project aims to secure the long-term conservation of the five bird species included in Annex I of the Birds Directive and the sustainable management of their wetland habitats around the city of Burgas. To achieve this, it plans to: Wetland management on the Burgas lakes, Bulgaria
La nature mise en valeur The document is presenting the overal project (river restoration, extensiv agriculture development, etc.) and its impact on biodiversity. Alzette river restoration in Dumonshaff, Luxembourg
El Proyecto de mejora ecologica del rí­o Órbigo (tramo I) Article on the restoration project Órbigo River ecological status improvement, Spain
Restoration of the Liberty Island and its side-arm on the Danube - Layman’s Report This is the layman's report: a short illustrated summary of this restoration project financed by Life+ programme, coordinated by WWF with 5 partners to reopen a side arm of the Danube. Conservation and restoration of alluvial habitats of community interest on the Liberty Island and side channel
Ecological reconstruction works – Vlascuta Lake Project description Ecological Restoration of Vlascuta Lake, Romania
SURF nature, Good practice projects - examples from Romania Overview of key success factors for this project and their importance; Qualitative questions Restoration on Comana wetlands, Romania
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Die Deichrückverlegung bei Lenzen an der Elbe Interview with the project director. Dyke relocation on the river Elbe near Lenzen, Germany
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park Project description; Environmental issues; Beneficiaries; Administrative data Ecological Restoration of Pochina Lake, Romania
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Documento 4 (Presupuesto). Project Report Órbigo River ecological status improvement, Spain
The Guide to Multi-Benefit Cohesion Ploicy Investments in Nature and Green Infrastructure Case studies: Ecological restoration of Comana wetlands Restoration on Comana wetlands, Romania
The Salt of Life The whole website is interesting. Restoration of Atanasovsko Lake, Bulgaria
A bivaly-rehabilitácios területek elemzése a Nagyszéksos-To és a Tanaszi-semlyék eltérÅ‘ biotopjain Analysis of buffalo driven landscape rehabilitation projects Water supply and rehabilitation in Nagyszeksos-to Southern Hungary
restauration écologique en montagne, Production et utilisation de mélanges pour la préservation, projet Alp’Grain Revegetation of the Vernie Rouge ski slope in the Alps
Some aspects concerning wetland restoration programs in the Prut River Basin The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. Ecological Restoration of Mata Radeanu, Romania
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies Planning and implementing green infrastructure on a regional level in Romania Restoration on Comana wetlands, Romania
WETLIFE project's final report and deliverables The WETLIFE project aimed at reversal of negative changes in Amalva and Ž’uvintas mires. Restoration of hydrological conditions necessary for regeneration of mire habitats was the main key to reaching the aim. Additionally, the project had a goal to facilitate a shift in agricultural practices on peatlands in order to improve conditions for biodiversity and reduce rate of peat mineralization with all related environmental consequences. Finally, the project expected to raise awareness about wetlands and to serve as an example of successful wetland restoration and more sustainable use that could be replicated in other parts of the country.
see also project video: http://vimeo.com/41861643
Restoration of Amalvas and Žuvintas Wetlands, Lithuania
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Hochwasser: Rückverlegung des Deichs bewährt sich Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt.Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt. Dyke relocation on the river Elbe near Lenzen, Germany
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) The project included the widening of 3 section of the river and the reconstruction of an open check dam. Revitalization of the upper Drau River in Austria
The Órbigo River Restoration Project and its implications in flood risk prevention WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18
April, 2012. Bucharest-Romania
Session 4: Working with institutional stakeholders and other sectors, in particular in land use
Órbigo River ecological status improvement, Spain
La Seymaz Presentation of the Seymaz river and the renaturation project by Geneva Canton Renaturation of the Seymaz river, Switzerland
Sozio-ökonomische Betroffenheit der Landwirtschaft durch Deichrückverlegung im Bereich der brandenburgischen Mittelelbe unter Berücksichtigung betrieblicher Anpassungsmöglichkeiten Study on the socio-economic consequences for agriculture through the dyke relocation in the area of the Middle Elbe, taking operational adaptation measures into account. Dyke relocation on the river Elbe near Lenzen, Germany
NWRMs experience from Austria characterization of Austria's landcover, population density, topography and the traditional flood protection
National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned
Revitalization of the upper Drau River in Austria
Some aspects concerning wetland restoration programs in the Prut River Basin The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. Ecological Restoration of Vlascuta Lake, Romania
Telephone Interview with Norbert Sereinig (project responsible) discussion on financial aspects, details of the monitoring programme and governmental aspects Revitalization of the upper Drau River in Austria
Guí­a técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 Órbigo River ecological status improvement, Spain
Ecological Improvement Project in the Órbigo River (Stretch I) ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. Órbigo River ecological status improvement, Spain
Integrated Management Plan of The Natural Park Comana Parcul Natural Comana infiintat prin Hotararea de Guvern nr. 2151 din decembrie 2004 este situat in zona de sud a Romaniei, la distanta aproximativ egala intre Bucuresti si Giurgiu. Decizia de constituire a parcului a fost adoptata in baza documentatiei tehnice si stiintifice elaborate inca din anul 1954 de catre Academia Romana in vederea delimitarii si protejarii a doua arii de importanta floristica deosebita, respectiv Rezervatia Stiintifica de ghimpe (Ruscus aculeatus) si Rezervatia Stiintifica de bujor (Paeonia peregrina). Acestor doua rezervatii li s-a adaugat incepand din anul 2004 Balta Comana, ca rezervatie naturala si zona de protectie avifaunistica. Restoration on Comana wetlands, Romania
Ecological restoration in Czech Republic The main objectives of the mire restoration programme were: (i)restoration of natural (or near-natural) mire hydrology; (ii) enhancement of peat-forming vegetation and processes, (iii) conservation of natural mire biodiversity; and (iv) involvement of the public into local mire conservation.
Regarding hydrology, the aim of the restoration was to raise the water table to a natural (pre-drainage) level, decrease the /uctuations, and retain su1cient water in the mires especially during the driest periods.
Mire restoration within the Sumava National Park, Czech Republic
Ecological Restoration of Mata-Radeanu Complex The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds. The ecological importance of the park has been recognised at national as well as international levels.The project objective is to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park. A main aim is to resolve the environmental problems caused by human activities such as agriculture, pasturage, fishery and tourism in and around the Park. To deal with the degradation of hydrological structures, the project also aims to re-establish the ecological balance of the lakes, including improvement of the water level and its maintenance. The results of the project are linked by the designation of Mata – Radeanu Complex as Special Protected Area NATURA 2000 within The Lower Prut Floodplain Natural Park. Through the ecological restoration works at Mata – Radeanu Complex, the water level is maintained so the habitats are protected as in drought period so in the floods ones. Ecological Restoration of Mata Radeanu, Romania
Auenschutz - Hochwasserschutz - Wasserkraftnutzung. Beispiele für eine ökologisch vorbildliche Praxis Book describing a list of good practice examples of protection of floodplains, flood protection and hydropower use - mainly from Germany, Austria and Switzerland. Dyke relocation on the river Elbe near Lenzen, Germany
Sem’ les Alpes, Des semences d’origine locale pour la restauration de milieux ouverts en montagne alpine Revegetation of the Vernie Rouge ski slope in the Alps
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. River basin management of the Ill, France
Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 Project Finances, Value, Duration, Localisation, Objective, Activities Restoration on Comana wetlands, Romania
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) Dissemination material (video) on the restoration project Órbigo River ecological status improvement, Spain
Créer une prairie multi-espèce en zone inondable. Fiche technique n°05 Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain
Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. Establishing connectivity in the Ljubljanica river, Slovenia

Pagination

  • Next page ››

Funded by EU(link is external)
Service contract funded by the European Commission((Directorate General Environment)(link is external))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau(link is external) | Join the NWRM group on Join us in Linked In(link is external)

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18