Title | Abstract | Case study(ies) |
---|---|---|
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
Komplex vízvisszatartási akcioprogram a NagyszéksosTo vízrendszerében | Enhancement of water supply of a former lake/wetland area to preserve ecologic circumstances. Redirection of surplus drainage water to the area and the creation of a sepatate wetland site to give extra cleaning to water received from the treated municipal wastewater treatement plan | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur | Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. | River basin management of the Ill, France |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Vlascuta Lake, Romania |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects | Ecological Restoration of Pochina Lake, Romania |
LIFE FOR THE BOURGAS LAKE - Ensuring Conservation of Priority Bird Species and Coastal Habitats at the Bourgas Natura 2000 Wetland Sites | The †œLife for the Bourgas lakes† project aims to secure the long-term conservation of the five bird species included in Annex I of the Birds Directive and the sustainable management of their wetland habitats around the city of Burgas. To achieve this, it plans to: | Wetland management on the Burgas lakes, Bulgaria |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Restoration of the Liberty Island and its side-arm on the Danube - Layman’s Report | This is the layman's report: a short illustrated summary of this restoration project financed by Life+ programme, coordinated by WWF with 5 partners to reopen a side arm of the Danube. | Conservation and restoration of alluvial habitats of community interest on the Liberty Island and side channel |
Ecological reconstruction works – Vlascuta Lake | Project description | Ecological Restoration of Vlascuta Lake, Romania |
SURF nature, Good practice projects - examples from Romania | Overview of key success factors for this project and their importance; Qualitative questions | Restoration on Comana wetlands, Romania |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Pochina Lake, Romania |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 4 (Presupuesto). | Project Report | Órbigo River ecological status improvement, Spain |
The Guide to Multi-Benefit Cohesion Ploicy Investments in Nature and Green Infrastructure | Case studies: Ecological restoration of Comana wetlands | Restoration on Comana wetlands, Romania |
The Salt of Life | The whole website is interesting. | Restoration of Atanasovsko Lake, Bulgaria |
A bivaly-rehabilitácios területek elemzése a Nagyszéksos-To és a Tanaszi-semlyék eltérÅ‘ biotopjain | Analysis of buffalo driven landscape rehabilitation projects | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Mata Radeanu, Romania |
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies | Planning and implementing green infrastructure on a regional level in Romania | Restoration on Comana wetlands, Romania |
Telephone -Interview with PhD Josef Rosner | Telephone interview given by PhD Josef Rosner on Monday 28/04/2014 | No Tillage Field Trials in lower Austria |
WETLIFE project's final report and deliverables | The WETLIFE project aimed at reversal of negative changes in Amalva and Ž’uvintas mires. Restoration of hydrological conditions necessary for regeneration of mire habitats was the main key to reaching the aim. Additionally, the project had a goal to facilitate a shift in agricultural practices on peatlands in order to improve conditions for biodiversity and reduce rate of peat mineralization with all related environmental consequences. Finally, the project expected to raise awareness about wetlands and to serve as an example of successful wetland restoration and more sustainable use that could be replicated in other parts of the country. see also project video: http://vimeo.com/41861643 |
Restoration of Amalvas and Žuvintas Wetlands, Lithuania |
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Economic aspects of mulch and direct seeding- reduction of soil treatment, which changes in the operational result have to be expected? | comparison of different soil treating systems (conventional tillage, mulchseeding and direct seeding). By reducing tillage savings are possible. This is shown for different crops. | No Tillage Field Trials in lower Austria |
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) | The project included the widening of 3 section of the river and the reconstruction of an open check dam. | Revitalization of the upper Drau River in Austria |
The Órbigo River Restoration Project and its implications in flood risk prevention | WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18 April, 2012. Bucharest-Romania Session 4: Working with institutional stakeholders and other sectors, in particular in land use |
Órbigo River ecological status improvement, Spain |
La Seymaz | Presentation of the Seymaz river and the renaturation project by Geneva Canton | Renaturation of the Seymaz river, Switzerland |
NWRMs experience from Austria | characterization of Austria's landcover, population density, topography and the traditional flood protection National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned |
Revitalization of the upper Drau River in Austria |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Vlascuta Lake, Romania |
Telephone Interview with Norbert Sereinig (project responsible) | discussion on financial aspects, details of the monitoring programme and governmental aspects | Revitalization of the upper Drau River in Austria |
Guía técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad | Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 | Órbigo River ecological status improvement, Spain |
Ecological Improvement Project in the Órbigo River (Stretch I) | ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. | Órbigo River ecological status improvement, Spain |
Integrated Management Plan of The Natural Park Comana | Parcul Natural Comana infiintat prin Hotararea de Guvern nr. 2151 din decembrie 2004 este situat in zona de sud a Romaniei, la distanta aproximativ egala intre Bucuresti si Giurgiu. Decizia de constituire a parcului a fost adoptata in baza documentatiei tehnice si stiintifice elaborate inca din anul 1954 de catre Academia Romana in vederea delimitarii si protejarii a doua arii de importanta floristica deosebita, respectiv Rezervatia Stiintifica de ghimpe (Ruscus aculeatus) si Rezervatia Stiintifica de bujor (Paeonia peregrina). Acestor doua rezervatii li s-a adaugat incepand din anul 2004 Balta Comana, ca rezervatie naturala si zona de protectie avifaunistica. | Restoration on Comana wetlands, Romania |
conserving soil treatment systems- trials in Lower Austria | Summary of several field trials in Lower Austria Comparison of conventional tillage, mulchseeding and no tillage regarding Mykotoxins, yield,erosion etc. |
No Tillage Field Trials in lower Austria |
Ecological restoration in Czech Republic | The main objectives of the mire restoration programme were: (i)restoration of natural (or near-natural) mire hydrology; (ii) enhancement of peat-forming vegetation and processes, (iii) conservation of natural mire biodiversity; and (iv) involvement of the public into local mire conservation. Regarding hydrology, the aim of the restoration was to raise the water table to a natural (pre-drainage) level, decrease the /uctuations, and retain su1cient water in the mires especially during the driest periods. |
Mire restoration within the Sumava National Park, Czech Republic |
Ecological Restoration of Mata-Radeanu Complex | The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds. The ecological importance of the park has been recognised at national as well as international levels.The project objective is to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park. A main aim is to resolve the environmental problems caused by human activities such as agriculture, pasturage, fishery and tourism in and around the Park. To deal with the degradation of hydrological structures, the project also aims to re-establish the ecological balance of the lakes, including improvement of the water level and its maintenance. The results of the project are linked by the designation of Mata – Radeanu Complex as Special Protected Area NATURA 2000 within The Lower Prut Floodplain Natural Park. Through the ecological restoration works at Mata – Radeanu Complex, the water level is maintained so the habitats are protected as in drought period so in the floods ones. | Ecological Restoration of Mata Radeanu, Romania |
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim | Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. | River basin management of the Ill, France |
Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 | Project Finances, Value, Duration, Localisation, Objective, Activities | Restoration on Comana wetlands, Romania |
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) | Dissemination material (video) on the restoration project | Órbigo River ecological status improvement, Spain |
Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime | Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. | Establishing connectivity in the Ljubljanica river, Slovenia |
Estrategia Naciional de Restauración de Ríos (ENRR). Demarcacion Hidrográfica del Duero | Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. | Órbigo River ecological status improvement, Spain |
Ljubljanica Connects | Project description | Establishing connectivity in the Ljubljanica river, Slovenia |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Ecological Reconstruction works - Pochina Lake | Project description | Ecological Restoration of Pochina Lake, Romania |
Rehabilitation works for the dykes ON Mata Lake | Project description | Ecological Restoration of Mata Radeanu, Romania |
Erfolgreiche Feuchtgrünlandentwicklung durch Naturschutzmaßnahmen. Langfristige Veränderung von Flora, Vegetation und Avifauna am Beispiel des Ochsenmoores in der Dümmerniederung. | NLWKN website | Restoration of Wetlands in the Western Lowland Area of the Dümmer Lake, Germany |
Ecological Reconstruction Works– Vlascuta Lake | Description of the project | Ecological Restoration of Vlascuta Lake, Romania |
Renaturation de la Seymaz | report on technical issues of the Seymaz renaturation | Renaturation of the Seymaz river, Switzerland |
LIFE FOR THE BOURGAS LAKE - Ensuring Conservation of Priority Bird Species and Coastal Habitats at the Bourgas Natura 2000 Wetland Sites | The Bulgarian Black Sea coast consists of a complex of coastal wetlands providing important breeding and wintering habitats for a significant number of bird species. The complex is an important migration stop for hundreds of thousands of birds flying on the East-European migratory route “Via Pontica.” Notably, these coastal wetlands are the most significant breeding, wintering and staging sites in Europe for four globally endangered birds: pygmy cormorant (Phalacrocorax pygmeus); Dalmatian pelican (Pelecanus crispus); white-headed duck (Oxyura leucocephala); and ferruginous duck (Aythya niroca) as well as the bittern (Botaurus stellaris). Despite the wetlands being classified as Natura 2000 sites and being protected in specific areas according to national legislation, there are still major threats to these birds that need to be tackled. Many of these come from the immediate proximity of the major Black Sea port and tourist destination, Burgas. They include habitat change and disturbance, power lines, illegal killing, accidental net catching, and industrial accidents. | Wetland management on the Burgas lakes, Bulgaria |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 5 (Estudio morfológico). | Project Report | Órbigo River ecological status improvement, Spain |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte |