Title | Abstract | Case study(ies) |
---|---|---|
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) | The project included the widening of 3 section of the river and the reconstruction of an open check dam. | Revitalization of the upper Drau River in Austria |
NWRMs experience from Austria | characterization of Austria's landcover, population density, topography and the traditional flood protection National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned |
Revitalization of the upper Drau River in Austria |
Telephone Interview with Norbert Sereinig (project responsible) | discussion on financial aspects, details of the monitoring programme and governmental aspects | Revitalization of the upper Drau River in Austria |
LIFE Projekt Auenverbund Obere Drau | Detailed project description of the former LIFE project on the river Drau. We needed basic information on the region e.g. rainfall, temperature, runoff | Revitalization of the upper Drau River in Austria |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 5 (Estudio morfológico). | Project Report | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 4 (Presupuesto). | Project Report | Órbigo River ecological status improvement, Spain |
Estrategia Naciional de Restauración de Ríos (ENRR). Demarcacion Hidrográfica del Duero | Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] | Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration | Órbigo River ecological status improvement, Spain |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) | Dissemination material (video) on the restoration project | Órbigo River ecological status improvement, Spain |
Ecological Improvement Project in the Órbigo River (Stretch I) | ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. | Órbigo River ecological status improvement, Spain |
The Órbigo River Restoration Project and its implications in flood risk prevention | WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18 April, 2012. Bucharest-Romania Session 4: Working with institutional stakeholders and other sectors, in particular in land use |
Órbigo River ecological status improvement, Spain |
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
Guía técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad | Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 | Órbigo River ecological status improvement, Spain |
WETLIFE project's final report and deliverables | The WETLIFE project aimed at reversal of negative changes in Amalva and Ž’uvintas mires. Restoration of hydrological conditions necessary for regeneration of mire habitats was the main key to reaching the aim. Additionally, the project had a goal to facilitate a shift in agricultural practices on peatlands in order to improve conditions for biodiversity and reduce rate of peat mineralization with all related environmental consequences. Finally, the project expected to raise awareness about wetlands and to serve as an example of successful wetland restoration and more sustainable use that could be replicated in other parts of the country. see also project video: http://vimeo.com/41861643 |
Restoration of Amalvas and Žuvintas Wetlands, Lithuania |
Ljubljanica Connects | Project description | Establishing connectivity in the Ljubljanica river, Slovenia |
La Seymaz | Presentation of the Seymaz river and the renaturation project by Geneva Canton | Renaturation of the Seymaz river, Switzerland |
Les arrangements locaux et la durabilité de nouvelles activités rurales : le cas de la renaturation de la Haute-Seymaz (local arrangements and sustainability of new rural activities : the Haute-Seymaz renaturation case study) | Study on renaturation in Switzerland based on the Seymaz river case and focuses on governance and local arrangements | Renaturation of the Seymaz river, Switzerland |
Renaturation de la Seymaz | report on technical issues of the Seymaz renaturation | Renaturation of the Seymaz river, Switzerland |
Erfolgreiche Feuchtgrünlandentwicklung durch Naturschutzmaßnahmen. Langfristige Veränderung von Flora, Vegetation und Avifauna am Beispiel des Ochsenmoores in der Dümmerniederung. | NLWKN website | Restoration of Wetlands in the Western Lowland Area of the Dümmer Lake, Germany |
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim | Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. | River basin management of the Ill, France |
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur | Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. | River basin management of the Ill, France |
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 | Overview on costs | River basin management of the Ill, France |
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies | Planning and implementing green infrastructure on a regional level in Romania | Restoration on Comana wetlands, Romania |
SURF nature, Good practice projects - examples from Romania | Overview of key success factors for this project and their importance; Qualitative questions | Restoration on Comana wetlands, Romania |
The Guide to Multi-Benefit Cohesion Ploicy Investments in Nature and Green Infrastructure | Case studies: Ecological restoration of Comana wetlands | Restoration on Comana wetlands, Romania |
Integrated Management Plan of The Natural Park Comana | Parcul Natural Comana infiintat prin Hotararea de Guvern nr. 2151 din decembrie 2004 este situat in zona de sud a Romaniei, la distanta aproximativ egala intre Bucuresti si Giurgiu. Decizia de constituire a parcului a fost adoptata in baza documentatiei tehnice si stiintifice elaborate inca din anul 1954 de catre Academia Romana in vederea delimitarii si protejarii a doua arii de importanta floristica deosebita, respectiv Rezervatia Stiintifica de ghimpe (Ruscus aculeatus) si Rezervatia Stiintifica de bujor (Paeonia peregrina). Acestor doua rezervatii li s-a adaugat incepand din anul 2004 Balta Comana, ca rezervatie naturala si zona de protectie avifaunistica. | Restoration on Comana wetlands, Romania |
Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 | Project Finances, Value, Duration, Localisation, Objective, Activities | Restoration on Comana wetlands, Romania |
Komplex vízvisszatartási akcioprogram a NagyszéksosTo vízrendszerében | Enhancement of water supply of a former lake/wetland area to preserve ecologic circumstances. Redirection of surplus drainage water to the area and the creation of a sepatate wetland site to give extra cleaning to water received from the treated municipal wastewater treatement plan | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
A MÓRAHALMI NAGYSZÉKSÓS-TÓ VíZKÉMIAI VIZSGíLATAINAK ELEMZÉSE | Overview of the water quality monitoring results of the lake (HURO/0901/207/2.2.2 project) | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
A bivaly-rehabilitácios területek elemzése a Nagyszéksos-To és a Tanaszi-semlyék eltérÅ‘ biotopjain | Analysis of buffalo driven landscape rehabilitation projects | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
Salt of Life - Urgent Measures to Restore and Secure Long-term Preservation of the Atanasovsko Lake Coastal Lagoon | Restore habitats, roosting and breeding sites by dykes and barriers repair | Restoration of Atanasovsko Lake, Bulgaria |
The Salt of Life | The whole website is interesting. | Restoration of Atanasovsko Lake, Bulgaria |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Vlascuta Lake, Romania |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Vlascuta Lake, Romania |
Ecological Reconstruction Works– Vlascuta Lake | Description of the project | Ecological Restoration of Vlascuta Lake, Romania |
Ecological reconstruction works – Vlascuta Lake | Project description | Ecological Restoration of Vlascuta Lake, Romania |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects | Ecological Restoration of Pochina Lake, Romania |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Pochina Lake, Romania |
Ecological Reconstruction works - Pochina Lake | Project description | Ecological Restoration of Pochina Lake, Romania |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Mata Radeanu, Romania |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Mata Radeanu, Romania |
Natural Park of the Lower Prut Floodplain - Project LIFE 05 NAT/RO /000155 | Description of the project. | Ecological Restoration of Mata Radeanu, Romania |
Ecological Restoration of Mata-Radeanu Complex | The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds. The ecological importance of the park has been recognised at national as well as international levels.The project objective is to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park. A main aim is to resolve the environmental problems caused by human activities such as agriculture, pasturage, fishery and tourism in and around the Park. To deal with the degradation of hydrological structures, the project also aims to re-establish the ecological balance of the lakes, including improvement of the water level and its maintenance. The results of the project are linked by the designation of Mata – Radeanu Complex as Special Protected Area NATURA 2000 within The Lower Prut Floodplain Natural Park. Through the ecological restoration works at Mata – Radeanu Complex, the water level is maintained so the habitats are protected as in drought period so in the floods ones. | Ecological Restoration of Mata Radeanu, Romania |
Rehabilitation works for the dykes ON Mata Lake | Project description | Ecological Restoration of Mata Radeanu, Romania |
Ecological restoration in Czech Republic | The main objectives of the mire restoration programme were: (i)restoration of natural (or near-natural) mire hydrology; (ii) enhancement of peat-forming vegetation and processes, (iii) conservation of natural mire biodiversity; and (iv) involvement of the public into local mire conservation. Regarding hydrology, the aim of the restoration was to raise the water table to a natural (pre-drainage) level, decrease the /uctuations, and retain su1cient water in the mires especially during the driest periods. |
Mire restoration within the Sumava National Park, Czech Republic |
Restoration of Drained Mires (Å umava National Park, Czech Republic) | About 70% of mires in the Šumava Mountains have been influenced by past drainage for variously forestry, agriculture and peat extraction. Since 1999, a comprehensive “Mire Restoration Programme” has been implemented in the Šumava National Park, primarily focused on the disturbed hydrology. The main restoration technique used has been the blocking of drainage ditches. Selected drained and intact mires were also monitored with the aim: (i) to characterise the degradation changes induced by the disturbed hydrology; and (ii) to evaluate the success of restoration. Water-table fluctuations, hydrochemistry of groundwater, surface-water outflow, amount of precipitation and the vegetation on permanent plots have been monitored. Pre-restoration monitoring data had shown differences between drained and intact sites. On drained bog sites, water tables were maintained at lower levels and exhibited higher fluctuations compared to intact sites. Expansion of the more competitive grasses and trees towards the bog expanse was recorded on drained bogs as well as expansion of dwarf shrub vegetation and reduction of Trichophorum lawns and hollow vegetation. Preliminary results from the initial post-restoration phase have shown a rise in the water table, stabilisation of the hydrological regime and some changes in hydrochemistry at restored sites. |
Mire restoration within the Sumava National Park, Czech Republic |
Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime | Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. | Establishing connectivity in the Ljubljanica river, Slovenia |