Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 55 results found

Sector

  • Hydro Morphology (55)
  • Forest (16)
  • Agriculture (3)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Stream bed re-naturalization (53)
  • Riverbed material renaturalization (40)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Basins and ponds (35)
  • (-) Lake restoration (24)
Title Abstract Case study(ies)
LIFE FOR THE BOURGAS LAKE - Ensuring Conservation of Priority Bird Species and Coastal Habitats at the Bourgas Natura 2000 Wetland Sites The †œLife for the Bourgas lakes† project aims to secure the long-term conservation of the five bird species included in Annex I of the Birds Directive and the sustainable management of their wetland habitats around the city of Burgas. To achieve this, it plans to: Wetland management on the Burgas lakes, Bulgaria
LIFE FOR THE BOURGAS LAKE - Ensuring Conservation of Priority Bird Species and Coastal Habitats at the Bourgas Natura 2000 Wetland Sites The Bulgarian Black Sea coast consists of a complex of coastal wetlands providing important breeding and wintering habitats for a significant number of bird species. The complex is an important migration stop for hundreds of thousands of birds flying on the East-European migratory route “Via Pontica.” Notably, these coastal wetlands are the most significant breeding, wintering and staging sites in Europe for four globally endangered birds: pygmy cormorant (Phalacrocorax pygmeus); Dalmatian pelican (Pelecanus crispus); white-headed duck (Oxyura leucocephala); and ferruginous duck (Aythya niroca) as well as the bittern (Botaurus stellaris). Despite the wetlands being classified as Natura 2000 sites and being protected in specific areas according to national legislation, there are still major threats to these birds that need to be tackled. Many of these come from the immediate proximity of the major Black Sea port and tourist destination, Burgas. They include habitat change and disturbance, power lines, illegal killing, accidental net catching, and industrial accidents.  Wetland management on the Burgas lakes, Bulgaria
NEW: final reports for Slowing the Flow at Pickering project This webpage links to the phase 1 and phase 2 reports of the project. Slowing the Flow at Pickering, UK
Retours d’expérience sur la restauration de prairies humides Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain
Créer une prairie multi-espèce en zone inondable. Fiche technique n°05 Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain

Pagination

  • Previous page ‹‹

Funded by EU
Service contract funded by the European Commission((Directorate General Environment))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau | Join the NWRM group on Join us in Linked In

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18