Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 67 results found

Sector

  • Hydro Morphology (67)
  • Forest (36)
  • Agriculture (3)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Riverbed material renaturalization (40)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Stream bed re-naturalization (53)
  • (-) Reconnection of oxbow lakes and similar features (18)
Show more
Title Abstract Case study(ies)
River Órbigo Restoration Project Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) Órbigo River ecological status improvement, Spain
www.symasol.fr The website presents all the projects the SYMASOL is responsible for, particularly the Contrat de rivière in which frame this precise measure take place. Restoration of river Hermance, France
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. River basin management of the Ill, France
Aménagement des berges en génie végétal et mise en place de zones annexes sur la Scarpe canalisée à Arras Revitalisation of the Scarpe river by changing the riverbanks from grey to green infrastructure and connection of hydraulic annexes to enhance water storage. Revitalisation of riverbanks and connection of hydraulic annexes alongside the Scarpe river in France
El Proyecto de mejora ecologica del rí­o Órbigo (tramo I) Article on the restoration project Órbigo River ecological status improvement, Spain
ES2200035 -Tramos Bajos del Aragon y del Arga Natura 2000 data set for lower reaches of the Aragon and Arga Rivers Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Documento 4 (Presupuesto). Project Report Órbigo River ecological status improvement, Spain
Effect of land development and forest management on hydrologic response in southeastern coastal wetlands: a review Land development activities such as agriculture, clear cutting, peat mining, and the planting of forest plantations on wetlands can affect the hydrologic behavior of these ecosystems by affecting their water storage and release patterns on the landscape. The effects of these development activities on hydrologic fluxes in peatlands (Typic Medisaprists) were compared to the effects of forest management practices in North Carolina using a field-tested hydrologic simulation model (DRAINMOD). Simulations revealed that natural peat-based (Histosol) pocosin systems lose 66% (80 cm) of the 123 cm of average annual rainfall by evapo-transpiration (ET) and 34% (42 cm/yr) via annual runoff. Annual runoff values were 63 cm/yr for peat mining areas, 48 cm/yr for cleared peatlands, 46 cm/yr for peatlands converted to agriculture and 34 cm/yr for pine plantations, once the forest canopy is closed. Thus, these wetland alterations, except for forestry, significantly increased runoff and decreased ET compared to the natural ecosystem. Forest pine plantation management decreased runoff and increased ET. A case study of the effects of forest management practices was reviewed for a 15-year-old drained loblolly pine plantation growing on fine sandy loam soils (Thermic Typic umbraquults) in the coastal plains of North Carolina. Forestry activities such as thinning (i.e., reduced leaf area index by 50%) decreased ET and canopy interception and nearly doubled drainage loss (38 cm/yr to 60 cm/yr). Commonly applied forest practices, such as drainage, increased the average number of flow events with flows > 5 mm/day to 86 days per year from 26 days per year under natural conditions. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Evolution of Babina polder
after restoration works
The Danube Delta Biosphere Reserve is an area where governmental decision makers,
scientists and local communities co-operate to develop a pilot programme for the administration
of the territory and the waters. The objective is to harmonize the requirements of
the local populations with the necessity for conservation of natural processes and biological
resources.
Babina Restoration Project, Romania
Integrated Rhine Programme Baden Wurtemberg Handout of the Site Visit of the 2nd Western Regional NWRM Workshop
Overview on single measures, costs, the administrative structure behind it
Polder management near Altenheim, Germany
LIFE+ Project Mink Territory The LIFE + MINK TERRITORY project is directed at restoring the river habitats along the lower reaches of the Aragón and Arga rivers in Navarre and at increasing the mink population there. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) The project included the widening of 3 section of the river and the reconstruction of an open check dam. Revitalization of the upper Drau River in Austria
Plan Nacional de Restauracion de Rí­os Este Ministerio está desarrollando, en consonancia con la Directiva marco del agua y la Directiva de evaluación y gestión de los riesgos de inundación, la Estrategia Nacional de Restauración de Ríos, un conjunto de actuaciones con el fin de conservar y recuperar el buen estado de nuestros ríos, minimizar los riesgos de inundación, potenciar su patrimonio cultural, fomentar el uso racional del espacio fluvial e impulsar el desarrollo sostenible del medio rural.
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Arga. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
The Órbigo River Restoration Project and its implications in flood risk prevention WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18
April, 2012. Bucharest-Romania
Session 4: Working with institutional stakeholders and other sectors, in particular in land use
Órbigo River ecological status improvement, Spain
La Seymaz Presentation of the Seymaz river and the renaturation project by Geneva Canton Renaturation of the Seymaz river, Switzerland
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Aragon. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
NWRMs experience from Austria characterization of Austria's landcover, population density, topography and the traditional flood protection
National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned
Revitalization of the upper Drau River in Austria
Natural water retention for combined outcomes - the Arga-Aragon case study (Spain) Presentation from Fernando Magdaleno Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Lugares de importancia comunitaria: Tramos Bajos del Aragon y del Arga List of important places for biodiversity in Navarra Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Telephone Interview with Norbert Sereinig (project responsible) discussion on financial aspects, details of the monitoring programme and governmental aspects Revitalization of the upper Drau River in Austria
Guí­a técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 Órbigo River ecological status improvement, Spain
The Fortuna Restoration Project The aim of the project was to connecting agricultural polder Fortuna (2.115 ha) to the Danube regime. Restoration of hydrological regime and hydrological functions means for this area, restoring and establishing the following functions: - habitat for plants and animals typical alluvial areas; - habitat and breeding area for fish and aquatic birds; - reservoir for biodiversity and providing genetic resources; - biocoridor and genetic exchange; - organic production; - biogeochemical circuit elements; - retention of sediments and pollutions; Black Sea biofilter. Fortuna Restoration Project in the Danube Delta, Romania
Ecological Improvement Project in the Órbigo River (Stretch I) ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. Órbigo River ecological status improvement, Spain
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 2: bilan technique et financier The reports presents the technical and financial results of the Contrat de rivière project Restoration of river Hermance, France
Ormoz basins guidebook Ormož Basins are a wetland of exceptional national and international importance attracting both breeding and migrating bird species of conservation importance. This guidebook aims to show life in various forms thriving in what used to be an abandoned industrial area, saved from destruction and later declared a nature reserve dedicated to conservation of biodiversity providing relaxed, informative and high quality experience of nature. This guidebook presents history of the site, birds, management of the area and photos. LiveDrava - Riparian Ecosystem Restoration of the Lower Drava River in Slovenia
Changes in the functioning of wetlands along environmental gradients One of the prevalent gradients in wetlands is the continuum of depth and frequency of flooding. While much emphasis has been placed on the importance of hydrology as a driving force for wetlands, few other perspectives have emerged to demonstrate unifying patterns and principles. In contrast to the wetness continuum, the functioning of wetlands can be separated into two broad categories: (1) landscape-based transitions that occur within a wetland or group of similar wetland types and (2) resource-based transitions that allow comparisons of the flow of water and processing of nutrients among very different wetland types. Landscape-based continua include the transition from upstream to downstream in riverine wetlands and between aquatic and terrestrial ecosystems within a wetland. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Project web site Project web site contains the Detailed project presentation (summary, threats, purpose and goals, actions and achievements), Description of the project area, List of available documents, Newsletters, Didactic game, Contacts, ... Conservation on Lake Cerknica, Slovenia
Cerknisko Jezero - Intermittent Cerknica Lake, Project Description The project aimed to ensure long-term favourable conditions for the conservation of turloughs and other endangered habitat types and associated
plant and animal species at Lake Cerknica. It simultaneously sought to promote an even development of local agriculture, forestry, fishing, tourism, recreation and education in accordance with natural values.
Conservation on Lake Cerknica, Slovenia
BIOMURA - Conservation of biodiversity of the Mura river in Slovenia The bed of the river Mura that flows through NE Slovenia is well preserved, especially in the middle and lower stream, where it is characterised by embankment erosion, deposition of the sand, flooding and side-channels. Deepening of the riverbed due to send accumulation behind the dams of hydropower stations in Austria, however, has resulted in a greater risk of flooding. There are no dams on Slovenian river section, but plans to alter this situation are resurfacing. Conservation of Mura banks, Slovenia
TERRITORIO VISÓN - Recuperacion ambiental del Territorio Fluvial; espacio vital del vison europeo (Mustela lutreola) - LIFE09 NAT/ES/000531 El proyecto LIFE+ TERRITORIO VISÓN es un proyecto financiado por la Comisión Europea a través del Programa LIFE+ 2009 “Naturaleza y Biodiversidad”. Tiene por objeto la recuperación de los hábitats fluviales y la mejora de la biodiversidad de los tramos bajos de los ríos Arga y Aragón, lugares de importancia comunitaria (LIC) incluidos en la Red Natura 2000, y la zona de mayor densidad de población de visón europeo (Mustela lutreola) en Europa occidental, a la vez que optimiza la defensa contra inundaciones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Kleinteilige Maßnahmen im Rahmen der „Gewässernachbarschaftstage“ in Hamburg Urbane Gewässer, Sohlstruktur, Kooperation Auch in den dicht besiedelten Bereichen einer Großstadt ist eine wirksame und kostengünstige Umsetzung der Ziele der Wasserrahmenrichtlinie möglich. An jeweils einem Gewässerabschnitt am Osterbek und der Mittleren Bille in Hamburg werden im Rahmen der „Gewässernachbarschaftstage“ die Gewässerbett- und Uferstruktur verbessert, um den Lebensraum für standorttypische Tier- und Pflanzengesellschaften aufzuwerten und eine größere Strukturvielfalt zu erreichen Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. River basin management of the Ill, France
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) Dissemination material (video) on the restoration project Órbigo River ecological status improvement, Spain
Estrategia Naciional de Restauración de Rí­os (ENRR). Demarcacion Hidrográfica del Duero Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. Órbigo River ecological status improvement, Spain
Ecological restoration in Czech Republic Reestablish the stream channel natural conditions; correct hydrological and hydrogeological parameters regarding a better soil retention, lower channel discharge, higher groundwater level; and restore the biodiviersity of fauna and flora Restoration of the Cerny Potok stream, Czech-Republic
Approval for environmental terms for implementation of forest hydroeconomy works in mountainous areas in part of the river basin of Xiropotamos The retention measures include afforastation and planting as well as construction of small scale dams to decrease the stream gradient in order to decrease soil erosion and flood events. Increasing water retention through afforestation, landscaping and reducing the stream gradient in Xiropotamos River Basin, Greece
The Integrated Rhine Programme, flood control and restoration of former floodplains along the upper rhine Concept Note of the project: legal background, history of the modification of the Rhine, flood risk and near-natural flood protection Polder management near Altenheim, Germany
Publicaciones sobre restauración fluvial Publications concerning watercourse restoration Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) Project Report Órbigo River ecological status improvement, Spain
Case study:The Babina Restoration Project Until the 20th century vast areas of the Danube Delta faced only minimal human impacts through extensive fishery and reed harvesting. Since then the Danube Delta has undergone multiple human impacts like embankment, channelization and drainage. Moreover, large areas were diked and the polders used for agriculture. The Babina polder (2.100 ha) was reconnected to the Danube in 1994 and recovery has been monitored by the Danube Delta National Institute for Research and Development. Within a few years a redevelopment of the site-specific biodiversity occurred and ecosystem services like nutrient retention and fish recruitment became obvious. Additionally, the reconnected polder enable reed harvesting, grazing, fishing and ecotourism. Babina Restoration Project, Romania
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 1: état des lieux initial et final The report presents the results of the Contrat de rivière project, which includes Heramnce restoration project. It details initial state and final state regarding indicators linked to water quality, hydromorphological status etc Restoration of river Hermance, France
Action Plan for Renaturation of watercourses in the area of Cerknica Lake (Akcijski plan renaturacije vodotokov na območju Cerkniškega jezera) - available in Slovenian language The document consists of historical overview of developments at Cerknica Lake, changed water regime and its consequences, and detailed action plan for renaturation of watercourses of Cerknica Lake. Conservation on Lake Cerknica, Slovenia
The Danube Delta Biosphere Reserve The presentation on Danube Delta Fortuna Restoration Project in the Danube Delta, Romania
BIOMURA Removal of heightned banks to stimulate the erosion and widening the river profile, intoruduction of rock-fill riffle to raise water levels during low and average flows, reopening of the side- channels and intoruduction of a system of wooden sluices to raise groundwater tables. Conservation of Mura banks, Slovenia
Renaturation de la Seymaz report on technical issues of the Seymaz renaturation Renaturation of the Seymaz river, Switzerland
Tramos Bajos del Aragon y del Arga Factsheet filled with data from Natura 2000 data set Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain

Pagination

  • Next page ››

Funded by EU(link is external)
Service contract funded by the European Commission((Directorate General Environment)(link is external))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau(link is external) | Join the NWRM group on Join us in Linked In(link is external)

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18