Title | Abstract | Case study(ies) |
---|---|---|
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 1: état des lieux initial et final | The report presents the results of the Contrat de rivière project, which includes Heramnce restoration project. It details initial state and final state regarding indicators linked to water quality, hydromorphological status etc | Restoration of river Hermance, France |
Action Plan for Renaturation of watercourses in the area of Cerknica Lake (Akcijski plan renaturacije vodotokov na obmoÄju Cerkniškega jezera) - available in Slovenian language | The document consists of historical overview of developments at Cerknica Lake, changed water regime and its consequences, and detailed action plan for renaturation of watercourses of Cerknica Lake. | Conservation on Lake Cerknica, Slovenia |
Renaturation de la Seymaz | report on technical issues of the Seymaz renaturation | Renaturation of the Seymaz river, Switzerland |
Tramos Bajos del Aragon y del Arga | Factsheet filled with data from Natura 2000 data set | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 5 (Estudio morfológico). | Project Report | Órbigo River ecological status improvement, Spain |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 | Overview on costs | River basin management of the Ill, France |
Interventi estesi di riqualificazione fluviale lungo gli affluenti del medio corso del Fiume Dese | The Veneto Region, through the †œPlan for diffuse pollution prevention and restoration of water in the draining basins of the Venice Lagoon† financed measures of re-calibration of riverbeds aimed at the renaturation of the hydraulic web, to increase the time of permanence of water and phytodepuration processes in the draining basin. In this framework, the Consorzio Acque Risorgive implemented a series of extended interventions on the area under its responsibility. This case study was implemented as part of these interventions. In particular, it aimed at re-structuring the effluents of the mid course of the Dese river (Rio S. Martino, Rio S. Ambrogio and Scolo Desolino). Such effluents are mostly draining channels, draining water from agricultural fields to the Dese river. The primary objective was the reduction of the amount of N and P reaching the Venice lagoon through phytodepuration. However, at the same time the project carried out the restoration of the draining channel web aimed at reducing flooding issues affecting the area. The following measures were implemented: †¢ Riparian buffer zones †¢ Creation of wetlands †¢ River bed enlargement †¢ Creation and reconnection of floodplain and new buffer strips †¢ Channel naturalization, creation of new meandering channel |
Restructuring the effluent web in Italy |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] | Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration | Órbigo River ecological status improvement, Spain |
Small scale measures under the "Waters neighborhood Days" in Hamburg - Factsheet | The core of the activities carried out on Osterbek river was the installation of flow control arms at mean water level. Due to the width of the bundle of sticks of 2 to 2.5 m, they should contribute to a significant narrowing of the broad streambed. They were attached to three pegs that were fixed at the ground. In order to avoid under- or backflushing, the brushwood were strengthened with stones, coarse and fine gravel. A total of 14 flow control arms were installed at equal distances approximately transverse to the direction of flow on the left and right bank . In a wide section an island of gravel and coarse of about 15 m was applied. Also in the Middle Bille flow control arms were installed consisting of dead wood, stones and gravel. The brushwood was shortened to a length of about 1 m and transversely and with a slight tilt attached to two pegs in the sole. The height of the installment was also based on mean water level |
Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany |
Notranjski regijski park, Layman's Report | Layman's Report (project report intended for wider public) presents background, goals and purpose of the project, planned solutions, actions and result. At the end it describes the meaning and the message of the project. | Conservation on Lake Cerknica, Slovenia |
Odense Å ved Brobyværk | De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. | Restoration of the Odense river, Denmark |
LIFE Projekt Auenverbund Obere Drau | Detailed project description of the former LIFE project on the river Drau. We needed basic information on the region e.g. rainfall, temperature, runoff | Revitalization of the upper Drau River in Austria |
RESTORE Database | Description of the interventions | River restoration of the lower Aurino in Italy |
Effect of meander restoration on macroinvertebratebiodiversity: the case of the Borová stream(Blanskí½ Les, Czech Republic) | This study brings a view on the effects of restoration of a formerly channelized small submontane stream situated in the Blanský Les Protected Landscape Area (South Bohemia, Czech Republic) on macroinvertebrate assemblages as an indicator group. The restoration project was carried out during two stages (1998 and 2000). It consisted of excavating a new channel to restore the historic meandering pattern. The evaluation of this project is primarily based on the comparison of composition between pre-restoration (1995) and post-restoration (2000–2003) macroinvertebrate samples focusing on species richness, species composition, and representation of rare Ephemeroptera and Plecoptera species. The analyses showed a substantial increase in species richness that was especially prominent shortly after the restoration intervention. This increase was not only due to the creation of lentic habitats, but was even observed at every single sampling site of the stream. The DCA ordination of species composition of the pre- and post-restoration sites indicated a considerable increase in the between-site diversity. This was apparently caused mainly by the establishing of lentic habitats, whereas diversity of lotic sites showed only a slight increase, which was most prominent during the last year of the sampling period. The shift in the species composition was profound for lotic sites as well. Although the restoration intervention considerably increased species richness and markedly changed species composition, there was no detectable increase of rare or vulnerable Ephemeroptera and Plecoptera species. | Revitalisation of the Borova stream, Czech Republic |
Les arrangements locaux et la durabilité de nouvelles activités rurales : le cas de la renaturation de la Haute-Seymaz (local arrangements and sustainability of new rural activities : the Haute-Seymaz renaturation case study) | Study on renaturation in Switzerland based on the Seymaz river case and focuses on governance and local arrangements | Renaturation of the Seymaz river, Switzerland |
Linking floodplain hydraulics and sedimentation patterns along arestored river channel: River Odense, Denmark | The links between floodplain hydraulics and deposition of sediment,organic matter and phosphorus were investigated along a 6 km re-meandered channel section of RiverOdense, Denmark. A 2D dynamic river and floodplain model was set up for the investigated floodplainarea. The flow model was validated against in situ measurements of flow velocities and depths duringa one-day field campaign in January 2012. The predicted duration of inundations, distances to inflow, flow velocities, and informationon microtopography were compared with sedimentation patterns on the floodplain. Three distinct flowregimes were predicted by the hydraulic model and were classified as small, medium and large inundation events according to spatial extent and inundation depth. The model predicts spatially and temporally changing zones of confluence on the floodplain due to variations in inundation depth. | Restoration of the Odense river, Denmark |
Case study: LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica | In 2006 Notranjska Regional Park acquired financial support from European programme LIFE †“ Nature for project LIFE 06. The purpose of this project was the establishment of appropriate conditions for protection and conservation of animal and plant species and their habitats on Lake Cerknica. Factors that threaten the biodiversity on Lake Cerknica are modified watercourses, abandoning of meadow mowing and deficient knowledge of nature and its conservation. | Conservation on Lake Cerknica, Slovenia |
ES2200035 Tramos Bajos del Aragon y del Arga | Natura 2000 data set for lower reaches of the Aragon and Arga Rivers | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
El agua en navarra | La política del agua está viviendo un profundo proceso de renovación en Europa. Esta política se fundamenta en los principios de la Directiva Marco del Agua, que obliga a una nueva planificación hidrológica. Los ejes de esta planificación pretenden favorecer el buen estado de las aguas al tiempo que garantizan su disponibilidad y su uso sostenible. Navarra está adaptando sus políticas al nuevo modelo europeo de gestión y administración del agua. Avanzar hacia una gestión más sostenible del agua requiere el compromiso y la corresponsabilidad de los diferentes agentes institucionales y sociales. | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |