Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 64 results found

Sector

  • Hydro Morphology (64)
  • Forest (31)
  • Agriculture (3)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Riverbed material renaturalization (40)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Stream bed re-naturalization (53)
  • (-) Removal of dams and other longitudinal barriers (32)
Title Abstract Case study(ies)
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). Project Report Órbigo River ecological status improvement, Spain
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Anejo 5 (Estudio morfológico). Project Report Órbigo River ecological status improvement, Spain
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 Overview on costs River basin management of the Ill, France
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artí­culo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration Órbigo River ecological status improvement, Spain
Small scale measures under the "Waters neighborhood Days" in Hamburg - Factsheet The core of the activities carried out on Osterbek river was the installation of flow control arms at mean water level.
Due to the width of the bundle of sticks of 2 to 2.5 m, they should contribute to a significant narrowing of the broad streambed. They were attached to three pegs that were fixed at the ground. In order to avoid under- or backflushing, the brushwood were strengthened with stones, coarse and fine gravel. A total of 14 flow control arms were installed at equal distances approximately transverse to the direction of flow on the left and right bank . In a wide section an island of gravel and coarse of about 15 m was applied.
Also in the Middle Bille flow control arms were installed consisting of dead wood, stones and gravel. The brushwood was shortened to a length of about 1 m and transversely and with a slight tilt attached to two pegs in the sole. The height of the installment was also based on mean water level
Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany
Notranjski regijski park, Layman's Report Layman's Report (project report intended for wider public) presents background, goals and purpose of the project, planned solutions, actions and result. At the end it describes the meaning and the message of the project. Conservation on Lake Cerknica, Slovenia
LIFE Projekt Auenverbund Obere Drau Detailed project description of the former LIFE project on the river Drau. We needed basic information on the region e.g. rainfall, temperature, runoff Revitalization of the upper Drau River in Austria
Les arrangements locaux et la durabilité de nouvelles activités rurales : le cas de la renaturation de la Haute-Seymaz (local arrangements and sustainability of new rural activities : the Haute-Seymaz renaturation case study) Study on renaturation in Switzerland based on the Seymaz river case and focuses on governance and local arrangements Renaturation of the Seymaz river, Switzerland
Liberty Island Life + project Final proceedings (Hungarian) This is the page gathering all presentations made at the final conference of the project in 2013 which was gathering representatives from 5 countruies to exchange on the project, its results and follow up. Conservation and restoration of alluvial habitats of community interest on the Liberty Island and side channel
Case study: LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica In 2006 Notranjska Regional Park acquired financial support from European programme LIFE †“ Nature for project LIFE 06. The purpose of this project was the establishment of appropriate conditions for protection and conservation of animal and plant species and their habitats on Lake Cerknica. Factors that threaten the biodiversity on Lake Cerknica are modified watercourses, abandoning of meadow mowing and deficient knowledge of nature and its conservation. Conservation on Lake Cerknica, Slovenia
Restoration of Drained Mires (Å umava National Park, Czech Republic) About 70% of mires in the Šumava Mountains have been influenced by past drainage for variously forestry, agriculture and peat extraction. Since 1999, a comprehensive “Mire Restoration Programme” has been implemented in the Šumava National Park, primarily focused on the disturbed hydrology. The main restoration technique used has been the blocking of drainage ditches. Selected drained and intact mires were also monitored with the aim: (i) to characterise the degradation changes induced by the disturbed hydrology; and (ii) to evaluate the success of restoration. Water-table fluctuations, hydrochemistry of groundwater, surface-water outflow, amount of precipitation and the vegetation on permanent plots have been monitored. Pre-restoration monitoring data had shown differences between drained and intact sites. On drained bog sites, water tables were maintained at lower levels and exhibited higher fluctuations compared to intact sites. Expansion of the more competitive grasses and trees towards the bog expanse was recorded on drained bogs as well as expansion of dwarf shrub vegetation and reduction of Trichophorum lawns and hollow vegetation. Preliminary results from the initial post-restoration phase have shown a rise in the water table, stabilisation of the hydrological regime and some changes in hydrochemistry at restored sites.
Mire restoration within the Sumava National Park, Czech Republic
ES2200035 Tramos Bajos del Aragon y del Arga Natura 2000 data set for lower reaches of the Aragon and Arga Rivers Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
El agua en navarra La política del agua está viviendo un profundo proceso de renovación en Europa. Esta política se fundamenta en los principios de la Directiva Marco del Agua, que obliga a una nueva planificación hidrológica. Los ejes de esta planificación pretenden favorecer el buen estado de las aguas al tiempo que garantizan su disponibilidad y su uso sostenible. Navarra está adaptando sus políticas al nuevo modelo europeo de gestión y administración del agua. Avanzar hacia una gestión más sostenible del agua requiere el compromiso y la corresponsabilidad de los diferentes agentes institucionales y sociales. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain

Pagination

  • Previous page ‹‹

Funded by EU
Service contract funded by the European Commission((Directorate General Environment))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau | Join the NWRM group on Join us in Linked In

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18