Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 58 results found

Sector

  • Hydro Morphology (53)
  • Forest (31)
  • Urban (5)
  • Agriculture (3)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Riverbed material renaturalization (40)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Stream bed re-naturalization (53)
  • (-) Green Roofs (5)
Show more
Title Abstract Case study(ies)
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 Overview on costs River basin management of the Ill, France
Hopital cantonnal, zone sud; toiture végétalisée In 1973, it has been decided to install green roofs on new buildings of the southern area of the Hospital City in Geneva. The aim was first to rebuild a biotope which had disapeared in the urban area; architects became aware of the benefits that green roofs could provide on water retention only later, in 1989. Green roofs in Geneva, Switzerland
Stormwater management at the local scale: a green roof study, review and lessons learned Green roofs in Geneva, Switzerland
Approval for environmental terms for implementation of forest hydroeconomy works in mountainous areas in part of the river basin of Xiropotamos The retention measures include afforastation and planting as well as construction of small scale dams to decrease the stream gradient in order to decrease soil erosion and flood events. Increasing water retention through afforestation, landscaping and reducing the stream gradient in Xiropotamos River Basin, Greece
Climate Proofing Housing Landscapes This is the website describing elements of the project urban climate proofing, a project in inner London, a Life+ project (2013-2016) who developed an integrated approach to climate adaptation in urban areas by undertaking a package of affordable, light-engineering climate change adaptation measures based around the retrofitting of blue and green infrastructure.
More at Twitter: @GroundworkLON #urbanclimateproofing
Climate-Proofing Social Housing Landscapes
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy Functional restoration of the valley of Saint Ruph-Glière-Eau Morte

Pagination

  • Previous page ‹‹

Funded by EU(link is external)
Service contract funded by the European Commission((Directorate General Environment)(link is external))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau(link is external) | Join the NWRM group on Join us in Linked In(link is external)

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18