Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 75 results found

Sector

  • Hydro Morphology (75)
  • Forest (35)
  • Agriculture (7)
  • Urban (1)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Stream bed re-naturalization (53)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Riverbed material renaturalization (40)
  • (-) Removal of dams and other longitudinal barriers (32)
  • (-) Re-naturalisation of polder areas (3)
Show more
Title Abstract Case study(ies)
River Órbigo Restoration Project Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) Órbigo River ecological status improvement, Spain
Vandtillbageholdelse i vådområder: Odense Å case område Water detention through temporary flooding of wetlands can play a significant role in cutting of flow peaks, and thereby decreasing water levels and floodrisk in downstream towns and villages during incidents of extreme precipitation. Restoration of the Odense river, Denmark
www.symasol.fr The website presents all the projects the SYMASOL is responsible for, particularly the Contrat de rivière in which frame this precise measure take place. Restoration of river Hermance, France
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Phone interview Interview with Andrea Goltara, member of CIRF and part of the RESTORE project River restoration of the lower Aurino in Italy
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. River basin management of the Ill, France
El Proyecto de mejora ecologica del rí­o Órbigo (tramo I) Article on the restoration project Órbigo River ecological status improvement, Spain
Restoration of the Liberty Island and its side-arm on the Danube - Layman’s Report This is the layman's report: a short illustrated summary of this restoration project financed by Life+ programme, coordinated by WWF with 5 partners to reopen a side arm of the Danube. Conservation and restoration of alluvial habitats of community interest on the Liberty Island and side channel
SURF nature, Good practice projects - examples from Romania Overview of key success factors for this project and their importance; Qualitative questions Restoration on Comana wetlands, Romania
ES2200035 -Tramos Bajos del Aragon y del Arga Natura 2000 data set for lower reaches of the Aragon and Arga Rivers Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Project Nieuwsbrief - Vallei van de Grote Nete Eén van de hoekstenen van het hedendaagse waterbeleid is het principe ‘vasthouden-bergen-afvoeren’ zoals ook blijkt uit het bekkenbeheerplan. Door water maximaal vast te houden aan de bron of ter plaatse te laten infiltreren, wordt wateroverlast niet langer afgewenteld op stroomafwaarts gelegen gebieden. Diezelfdestrategie moet ook voor een oplossing zorgen in de strijd tegen verdroging die in het licht van een mogelijke klimaatsverandering wel eens belangrijk zou kunnen worden. Floodplain reconnection in the Vallei van de Grote Nete, Belgium
Proyecto para la mejora del estado ecológico del rí­o Órbigo. Tramo I (León). Documento 4 (Presupuesto). Project Report Órbigo River ecological status improvement, Spain
The Guide to Multi-Benefit Cohesion Ploicy Investments in Nature and Green Infrastructure Case studies: Ecological restoration of Comana wetlands Restoration on Comana wetlands, Romania
Effect of land development and forest management on hydrologic response in southeastern coastal wetlands: a review Land development activities such as agriculture, clear cutting, peat mining, and the planting of forest plantations on wetlands can affect the hydrologic behavior of these ecosystems by affecting their water storage and release patterns on the landscape. The effects of these development activities on hydrologic fluxes in peatlands (Typic Medisaprists) were compared to the effects of forest management practices in North Carolina using a field-tested hydrologic simulation model (DRAINMOD). Simulations revealed that natural peat-based (Histosol) pocosin systems lose 66% (80 cm) of the 123 cm of average annual rainfall by evapo-transpiration (ET) and 34% (42 cm/yr) via annual runoff. Annual runoff values were 63 cm/yr for peat mining areas, 48 cm/yr for cleared peatlands, 46 cm/yr for peatlands converted to agriculture and 34 cm/yr for pine plantations, once the forest canopy is closed. Thus, these wetland alterations, except for forestry, significantly increased runoff and decreased ET compared to the natural ecosystem. Forest pine plantation management decreased runoff and increased ET. A case study of the effects of forest management practices was reviewed for a 15-year-old drained loblolly pine plantation growing on fine sandy loam soils (Thermic Typic umbraquults) in the coastal plains of North Carolina. Forestry activities such as thinning (i.e., reduced leaf area index by 50%) decreased ET and canopy interception and nearly doubled drainage loss (38 cm/yr to 60 cm/yr). Commonly applied forest practices, such as drainage, increased the average number of flow events with flows > 5 mm/day to 86 days per year from 26 days per year under natural conditions. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies Planning and implementing green infrastructure on a regional level in Romania Restoration on Comana wetlands, Romania
Bruno Boz was actively involved in the design and implementation of these measures, as well as the other applications implemented by the Consorzio Phone Interview Restructuring the effluent web in Italy
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Integrated Rhine Programme Baden Wurtemberg Handout of the Site Visit of the 2nd Western Regional NWRM Workshop
Overview on single measures, costs, the administrative structure behind it
Polder management near Altenheim, Germany
Case study:Borova Stream and its Revitalisation Restoration of the length of the stream, increased by 6.3 km a shallow meandering stream bed, where sections of speedily running water alternated with sections of a slow stream were created Revitalisation of the Borova stream, Czech Republic
LIFE+ Project Mink Territory The LIFE + MINK TERRITORY project is directed at restoring the river habitats along the lower reaches of the Aragón and Arga rivers in Navarre and at increasing the mink population there. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011) The project included the widening of 3 section of the river and the reconstruction of an open check dam. Revitalization of the upper Drau River in Austria
Plan Nacional de Restauracion de Rí­os Este Ministerio está desarrollando, en consonancia con la Directiva marco del agua y la Directiva de evaluación y gestión de los riesgos de inundación, la Estrategia Nacional de Restauración de Ríos, un conjunto de actuaciones con el fin de conservar y recuperar el buen estado de nuestros ríos, minimizar los riesgos de inundación, potenciar su patrimonio cultural, fomentar el uso racional del espacio fluvial e impulsar el desarrollo sostenible del medio rural.
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Arga. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
The Órbigo River Restoration Project and its implications in flood risk prevention WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18
April, 2012. Bucharest-Romania
Session 4: Working with institutional stakeholders and other sectors, in particular in land use
Órbigo River ecological status improvement, Spain
La Seymaz Presentation of the Seymaz river and the renaturation project by Geneva Canton Renaturation of the Seymaz river, Switzerland
Foro del Agua de Navarra. Documento Técnico para la Participacion Publica en la Cuenca del Aragon. Documentacion previa para su análisis. Pamplona, marzo 2007 El objetivo de este documento es servir como base para la participación pública en torno a la gestión del agua y de sus principales problemas en la cuenca del Arga. De esta forma, se promueve el proceso de participación exigido por la Directiva Marco del Agua (2000/60) para la elaboración del Plan Hidrológico de la cuenca del Ebro, que tiene que ser aprobado en diciembre de 2009. Este plan va a suponer la revisión del plan hidrológico que se aprobó en 1998 y además, la incorporación de los requerimientos establecidos por la DMA. Por otro lado, la “estrategia para la gestióny el uso sostenible del agua en Navarra” también promueve estos procesos de participación pública, fundamentales para que el público en general y los afectados más directamente por el tema puedan participar en el proceso de la toma de decisiones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Improvement of the navigation conditions on the Danube between Calarasi and Braila KM 375-KM 175 Improvement of the navigation conditions on the Danube between Calarasi and Braila , by
ensuring the minimum depths of 2.5 m of the
fairway recommended by the Danube
Commission during the entire year, including the dry season.
Improvement of the navigation conditions on the Danube between Calarasi and Braila, Romania
NWRMs experience from Austria characterization of Austria's landcover, population density, topography and the traditional flood protection
National laws and technical rules for near-natural flood protection, principles of passive flood protection, critical lessons learned
Revitalization of the upper Drau River in Austria
Natural water retention for combined outcomes - the Arga-Aragon case study (Spain) Presentation from Fernando Magdaleno Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Lugares de importancia comunitaria: Tramos Bajos del Aragon y del Arga List of important places for biodiversity in Navarra Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Telephone Interview with Norbert Sereinig (project responsible) discussion on financial aspects, details of the monitoring programme and governmental aspects Revitalization of the upper Drau River in Austria
Guí­a técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 Órbigo River ecological status improvement, Spain
Ecological Improvement Project in the Órbigo River (Stretch I) ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. Órbigo River ecological status improvement, Spain
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 2: bilan technique et financier The reports presents the technical and financial results of the Contrat de rivière project Restoration of river Hermance, France
Changes in the functioning of wetlands along environmental gradients One of the prevalent gradients in wetlands is the continuum of depth and frequency of flooding. While much emphasis has been placed on the importance of hydrology as a driving force for wetlands, few other perspectives have emerged to demonstrate unifying patterns and principles. In contrast to the wetness continuum, the functioning of wetlands can be separated into two broad categories: (1) landscape-based transitions that occur within a wetland or group of similar wetland types and (2) resource-based transitions that allow comparisons of the flow of water and processing of nutrients among very different wetland types. Landscape-based continua include the transition from upstream to downstream in riverine wetlands and between aquatic and terrestrial ecosystems within a wetland. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Integrated Management Plan of The Natural Park Comana Parcul Natural Comana infiintat prin Hotararea de Guvern nr. 2151 din decembrie 2004 este situat in zona de sud a Romaniei, la distanta aproximativ egala intre Bucuresti si Giurgiu. Decizia de constituire a parcului a fost adoptata in baza documentatiei tehnice si stiintifice elaborate inca din anul 1954 de catre Academia Romana in vederea delimitarii si protejarii a doua arii de importanta floristica deosebita, respectiv Rezervatia Stiintifica de ghimpe (Ruscus aculeatus) si Rezervatia Stiintifica de bujor (Paeonia peregrina). Acestor doua rezervatii li s-a adaugat incepand din anul 2004 Balta Comana, ca rezervatie naturala si zona de protectie avifaunistica. Restoration on Comana wetlands, Romania
Projectbrochure Vallei van de Grote Nete The NWRM aims at restoring the natural flow of the river whilst increasing the possibility to buffer the water. Floodplain reconnection in the Vallei van de Grote Nete, Belgium
Ecological restoration in Czech Republic The main objectives of the mire restoration programme were: (i)restoration of natural (or near-natural) mire hydrology; (ii) enhancement of peat-forming vegetation and processes, (iii) conservation of natural mire biodiversity; and (iv) involvement of the public into local mire conservation.
Regarding hydrology, the aim of the restoration was to raise the water table to a natural (pre-drainage) level, decrease the /uctuations, and retain su1cient water in the mires especially during the driest periods.
Mire restoration within the Sumava National Park, Czech Republic
Phone interview Interview with Caterina Ghiraldo (Autonomous Province of Bozen) in charge of managing the implementation of measures River restoration of the lower Aurino in Italy
TERRITORIO VISÓN - Recuperacion ambiental del Territorio Fluvial; espacio vital del vison europeo (Mustela lutreola) - LIFE09 NAT/ES/000531 El proyecto LIFE+ TERRITORIO VISÓN es un proyecto financiado por la Comisión Europea a través del Programa LIFE+ 2009 “Naturaleza y Biodiversidad”. Tiene por objeto la recuperación de los hábitats fluviales y la mejora de la biodiversidad de los tramos bajos de los ríos Arga y Aragón, lugares de importancia comunitaria (LIC) incluidos en la Red Natura 2000, y la zona de mayor densidad de población de visón europeo (Mustela lutreola) en Europa occidental, a la vez que optimiza la defensa contra inundaciones. Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Sigmaplan - Vallei van de Grote Nete In de Vallei van de Grote Nete tussen Nijlen en Geel, krijgt de kronkelende rivier opnieuw meer ruimte, via een combinatie van de aanleg van een winterbedding en gecontroleerde waterbuffergebieden. Dat zijn GOG's zonder ringdijk. De winst is dubbel: de kans op overstromingen is kleiner en geleidelijk kan er weer natte natuur groeien, in de vorm van waardevol wetland.
Floodplain reconnection in the Vallei van de Grote Nete, Belgium
Phone interview Italy Phone interview: Paolo Cornelio is the person in charge of implementing NWRMs in the Consorzio's area of intervention Restructuring the effluent web in Italy
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. River basin management of the Ill, France
Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 Project Finances, Value, Duration, Localisation, Objective, Activities Restoration on Comana wetlands, Romania
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) Dissemination material (video) on the restoration project Órbigo River ecological status improvement, Spain
Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. Establishing connectivity in the Ljubljanica river, Slovenia
Estrategia Naciional de Restauración de Rí­os (ENRR). Demarcacion Hidrográfica del Duero Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. Órbigo River ecological status improvement, Spain
Piano di Gestione Basso Aurino †“ Relazione sintetica degli interventi realizzati in localití  Rienzfield, Gatzaue e Molini di Tures (2002-2011) River restoration measures were implemented along the Aurino stream as part of the Aurino management plan. Interventions were grouped in Work Packages and were implemented in different moments within the years 2003-2011. The objectives were flood protection and, secondarily, the improvement of the natural environment. Different interventions were implemented to widen the river bed, such as for example: (i) forests were cleared in the relevant areas, to add space to the river bed; (ii) (artificial) river banks were lowered and enlarged; (iii) re-activation or creation of lateral river branches; (iv) measures to raise the river bed†™s level. River restoration of the lower Aurino in Italy
The Integrated Rhine Programme, flood control and restoration of former floodplains along the upper rhine Concept Note of the project: legal background, history of the modification of the Rhine, flood risk and near-natural flood protection Polder management near Altenheim, Germany

Pagination

  • Next page ››

Funded by EU(link is external)
Service contract funded by the European Commission((Directorate General Environment)(link is external))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau(link is external) | Join the NWRM group on Join us in Linked In(link is external)

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18