Title | Abstract | Case study(ies) |
---|---|---|
Sutcliffe Park Briefing pack - External | Draft note for external distribution outlining the sitcliffe Park site, key messages | Restoring the River Quaggy in London, UK |
Weigall Road and Sutcliffe park | Site description and details of dimensions of NWRM measures | Restoring the River Quaggy in London, UK |
Sutcliffe Park Managment Plan - Draft | Sets out the manner in which Sutcliffe Park should be managed. | Restoring the River Quaggy in London, UK |
River Quaggy at Sutcliffe Park:Techniques: Re-meandering, backwater creation, de-culverting | Summary note on the NWRM appraoch used at Sutcliffe Park and the associated benefits observed. | Restoring the River Quaggy in London, UK |
a river reborn: Restoring the Quaggy River and tackling flooding | Summary of restoration work as part of flood alleviation scheme | Restoring the River Quaggy in London, UK |
River Quaggy FAS Scheme Overview | River Quaggy Flood Alleviation Scheme overview note | Restoring the River Quaggy in London, UK |
Sustainable stormwater management at Fornebu “ from an airport to an industrial and residential area of the city of Oslo, Norway | Sustainable stormwater management and green infrastructure in Fornebu, Norway | |
From airport to sustainable community sustainable Fornebu | The refurbishment of the 340-hectare Fornebu site – Oslo’s airport until 1998 – is one of Norway’s largest and most ambitious development projects, including new housing, businesses, recreation and conservation projects. One of two landowners at Fornebu, the Norwegian state, and its organ for construction and land development, Statsbygg (Norwegian Directorate of Public Construction and Property), have been heavily involved in work on Fornebu since 1995. | Sustainable stormwater management and green infrastructure in Fornebu, Norway |
The aesthetic performance of urban landscape-based stormwater management systems: a review of twenty projects in northern Europe | Driven by the challenge of adapting cities to climate change, stormwater management is high on the agenda of landscape architectural practice. This article aims to set light on associated landscape changes, presenting and evaluating twenty Northern European stormwater management projects with a specific view on their aesthetic performance. Five key parameters form the base for the analysis. These include 1) terrain changes, 2) construction and maintenance, 3) site history and context, 4) water dynamics and dimensioning, and 5) stormwater accentuation. Observations are illustrated by exemplary photos, arranged and discussed among varying cases. The study indicates that visible stormwater management enhances the experience of local terrain. However, stormwater management is weak as a main design feature and staging water ‘at any cost’ results in unsettled designs. Successful projects include only a few key water features and focus on programmatic interaction within the specific context. | Sustainable stormwater management and green infrastructure in Fornebu, Norway |
Project RMP5455: Slowing the Flow at Pickering, Final Report to Defra, Forest Research | The Project 'Slowing the Flow at Pickering' implements multiple natural flood risk measures including low level bunds, large woody debris dams, planting riparian and floodplain woodland, planting farm woodland, blocking moorland drains and establishing no-burn buffer zones, blocking forest drains and implementing farm-scale measures. The aim of the project is to show how land management measures can help to reduce flood risk from a river in the town and is implemented in close cooperation with local stakeholders. The project involved both the Pickering Beck and adjacent River Seven catchments, the description of measures described below relate to the former. | Slowing the Flow at Pickering, UK |
WFD Surface Water Objectives 2012 | Spreadsheet containing the classification status and environmental objectives for surface water bodies across all River Basin Districts in England and Wales. | Slowing the Flow at Pickering, UK |
National River Flow Archive | Data and catchment characteristics for Pickering Beck gauging station 27056 - Pickering Beck at Ings Bridge | Slowing the Flow at Pickering, UK |
Potential Use of Runoff Attenuation Features in small Rural Catchments for Flood Mitigation | Development of a number of small scale, low cost soft engineered flood reduction schemes, designed to store/attenuate rapid runoff in small rural catchments. Design and implimentation of a network of 35 NWRM measures in a Northumberland catchment. To aid understanding of how features impact on downstream flood hazard. | Rural runoff attenuation in the Belford catchment, UK |
A framework for managing runoff and pollution in the rural landscape using a Catchment Systems Engineering approach | Here a framework for applying a CSE approach to the catchment is shownin a step by step guide to implementing mitigation measures in the Belford Burn catchment. The framework is based around engagement with catchment stakeholders. | Rural runoff attenuation in the Belford catchment, UK |
Belford catchment proactive flood soutions: storing and attenuating runoff on farms | This paper represents the hydrological charateristics of the catchment, the design of pilot ponds and initial results | Rural runoff attenuation in the Belford catchment, UK |
Runoff management: Mitigation measures for disconnecting flow pathways in the Belford Burn catchmen to reduce flood Risk | This paper provides information on the NWRM features applied in the site | Rural runoff attenuation in the Belford catchment, UK |
Runoff Attenuation Features - A guide for all those working in catchment Management | This is a guide to runoff attenuation features (technical issues, environmental considerations etc) based on the work carried out as part of the Belford Catchment Solutions Project. | Rural runoff attenuation in the Belford catchment, UK |
Drainage Area Study of the city of Hradec Kralove, Czech Republic, and its utilization for urban planning | †“Removal or sinking of existing curbs, †“ Lowering or adjustment of the surface, †“ Transfer of stormwater from the area of street inlets to decentralized devices, †“ Taking apart gutters and street inlets within green areas |
Drainage management in the city of Hradec Kralove, Czech Republic |
Drainage Area Study of the city of Hradec Kralove, Czech Republic, and its utilization for urban planning | Drainage Area Study of the city of Hradec Kralove, Czech Republic, and its utilization for urban planning of Hradec Kralove and adjacent regions is a large water management project defining concept of stormwater management in the region in accordance with the sustainability principles. The goal of the study was to link rules and criteria of sustainable stormwater management with urban planning. In the framework of the study a complex assessment of the current status of water management including the risk of flooding was performed, potential of the existing development to approach pre-urbanization runoff behavior was evaluated and conditions of stormwater management in the planned development were specified. | Drainage management in the city of Hradec Kralove, Czech Republic |
Drainage area study of Hradec Kralove | The Drainage Area Study of city of Hradec Kralove is project, which going to be finished during year 2011. The project area covers not only the city of Hradec Kralove itself, but it includes the basin of small rivers and creeks flowing through the city as a part of urban drainage system. Main project task is focused to the assessment of the future condition of the storm water management in accordance with the sustainable development principles. One of the project goals is development and implementation of Best Management Practices for application of storm water management into the City‘s Development Plan as its integral part. | Drainage management in the city of Hradec Kralove, Czech Republic |
Nieuwe stad, schoon water | a design of a sustainable water management system in the Leische Rijn area includes ecological, hydrological and biological impacts | Leidsche Rijn sustainable urban development, Netherlands |
Voorbereiding praktijkonderzoek verticaal doorstroomd hylofytenfilter | study practical case vertical flow reedbed. Conclusions of the literature research and research of the Leidsche Rijn. ALso conclusions of laboratory extra research on different layouts of the filter and different phosphate binding materials. Balance-tests and column-tests were done. | Leidsche Rijn sustainable urban development, Netherlands |
Improvement of the navigation conditions on the Danube between Calarasi and Braila KM 375-KM 175 | Improvement of the navigation conditions on the Danube between Calarasi and Braila , by ensuring the minimum depths of 2.5 m of the fairway recommended by the Danube Commission during the entire year, including the dry season. |
Improvement of the navigation conditions on the Danube between Calarasi and Braila, Romania |
NEW: final reports for Slowing the Flow at Pickering project | This webpage links to the phase 1 and phase 2 reports of the project. | Slowing the Flow at Pickering, UK |
Le jardin des eaux à Fourqueux, un projet de parc et une gestion de l’eau à l’échelle du centre-ville | Jardin des Eaux (water garden) in Fourqueux, a water management system for the city centre | |
Reconstitution des écoulements de surface de deux affluents temporaires de la Clauge amont | Morphological restoration of temporary watercourses in the National Forest of Chaux | |
Dossier de demande d’autorisation au titre de la Loi sur l’Eau et les Milieux Aquatique et de Natura 2000 | Morphological restoration of temporary watercourses in the National Forest of Chaux |