Title | Abstract | Case study(ies) |
---|---|---|
A FEKETE-KÖRÖS ERDEINEK VíZPÓTLÁSA ÉS 15 ÉVES ÖKOLÓGIAI EREDMÉNYEI | Restoration of floodplain watercourse network to provide surface water supply to the forest from backwater of flood waves on the river Körös. During the execution of the job there came into being a 38.8 km long water-flow and a free water surface of 15.7 hectares. The work touched a forest area of more than 400 hectares with a direct positive ecological impact. During the execution of the system we were able to renovate partially a forest area damaged more than about 150 years ago. | Habitat Reconstruction in the forests of the Körös Valley, Hungary |
Bosco Limite | Land use change of a maize-cutivated area, with the costitution of a lowland forest of 25000 square meters. The aim is to create an ecological corridor for the neighboring Nature 2000 Area, with wetlands. Moreover, Bosco Limite is a sperimental project for the groundwater recharge. | Reforestation in Veneto, Italy |
Progetto "Il bosco Limite di Camazzole" | Project description | Reforestation in Veneto, Italy |
Phone interview | Phone interview aimed at getting a better understanding of (i) the overall project context; and (ii) the PES schemes established as part of the project. | Reforestation in Veneto, Italy |
Pollutant Removal Efficiencies and Flow Detention of Infiltration Trenches |
The study is carried out by flow weighted sampling at the inlet and outlet of one infiltration trench in Kungsbacka south of Gothenburg, located under the parking lot of a supermarket. The observations and sampling were conducted during April to June 2012 and the results from five storm events were analyzed. | Infiltration trenches in Kungsbacka, Sweden |