Title | Abstract | Case study(ies) |
---|---|---|
A MÓRAHALMI NAGYSZÉKSÓS-TÓ VíZKÉMIAI VIZSGíLATAINAK ELEMZÉSE | Overview of the water quality monitoring results of the lake (HURO/0901/207/2.2.2 project) | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
NEW: final reports for Slowing the Flow at Pickering project | This webpage links to the phase 1 and phase 2 reports of the project. | Slowing the Flow at Pickering, UK |
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
The Tolka catchment - fulfilling multiple roles: local government perspectives | Presentation on Tolka Valley Park, showing ecological measures and effects | River Tolka constructed wetland and enhancements, Ireland |
Komplex vízvisszatartási akcioprogram a NagyszéksosTo vízrendszerében | Enhancement of water supply of a former lake/wetland area to preserve ecologic circumstances. Redirection of surplus drainage water to the area and the creation of a sepatate wetland site to give extra cleaning to water received from the treated municipal wastewater treatement plan | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur | Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. | River basin management of the Ill, France |
Pilootprojecten Stroomgebied Voer | This presentation gives a short graphical overview of two executed NWRM's on the Horstergrub river less than one on the Belgian side of the border, one on the Dutch side of the border. The NWRM on the Belgian side of the border is the discussed NWRM. | Horstergrub sediment management, Belgium |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Restoration of the Liberty Island and its side-arm on the Danube - Layman’s Report | This is the layman's report: a short illustrated summary of this restoration project financed by Life+ programme, coordinated by WWF with 5 partners to reopen a side arm of the Danube. | Conservation and restoration of alluvial habitats of community interest on the Liberty Island and side channel |
Phone interview | Phone interview aimed at getting a better understanding of (i) the overall project context; and (ii) the PES schemes established as part of the project. | Reforestation in Veneto, Italy |
SURF nature, Good practice projects - examples from Romania | Overview of key success factors for this project and their importance; Qualitative questions | Restoration on Comana wetlands, Romania |
The Tolka catchment - fulfilling multiple roles: local government perspectives | Presentation of the Tolka catchment and its assets | River Tolka constructed wetland and enhancements, Ireland |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
National River Flow Archive | Data and catchment characteristics for Pickering Beck gauging station 27056 - Pickering Beck at Ings Bridge | Slowing the Flow at Pickering, UK |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 4 (Presupuesto). | Project Report | Órbigo River ecological status improvement, Spain |
The Guide to Multi-Benefit Cohesion Ploicy Investments in Nature and Green Infrastructure | Case studies: Ecological restoration of Comana wetlands | Restoration on Comana wetlands, Romania |
Case study: Ecoremediation System (ERM) for treatment of polluted tributary of Glinscica, Slovenia | The innovative ecoremediation (ERM) system for treatment of the polluted tributary of GlinšÄica was therefore installed in 2006, the ERM system consists of the sedimentation pond for the deposition of coarse particles and reduction of current flow velocity, a vegetated ditch filled with different mixtures of sand, planted with common reed (Phragmites australis) for the aerobic) “ anaerobic treatment and a meandered revitalized stream bed of the tributary for the additional treatment. | Pollution Treatment on the Glinščica, Slovenia |
A bivaly-rehabilitácios területek elemzése a Nagyszéksos-To és a Tanaszi-semlyék eltérÅ‘ biotopjain | Analysis of buffalo driven landscape rehabilitation projects | Water supply and rehabilitation in Nagyszeksos-to Southern Hungary |
Progetto "Il bosco Limite di Camazzole" | Project description | Reforestation in Veneto, Italy |
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies | Planning and implementing green infrastructure on a regional level in Romania | Restoration on Comana wetlands, Romania |
WETLIFE project's final report and deliverables | The WETLIFE project aimed at reversal of negative changes in Amalva and Ž’uvintas mires. Restoration of hydrological conditions necessary for regeneration of mire habitats was the main key to reaching the aim. Additionally, the project had a goal to facilitate a shift in agricultural practices on peatlands in order to improve conditions for biodiversity and reduce rate of peat mineralization with all related environmental consequences. Finally, the project expected to raise awareness about wetlands and to serve as an example of successful wetland restoration and more sustainable use that could be replicated in other parts of the country. see also project video: http://vimeo.com/41861643 |
Restoration of Amalvas and Žuvintas Wetlands, Lithuania |
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Small water reservoirs †“ their function and construction | Small water reservoirs play important role in rural areas. They used to be very popular, but most of them have been devastated in the last century. It is worth to restore them and to construct new ones. Very small reservoirs (ponds) can be constructed in economical and cost efficient way by individual farmers. In regard to damming below 1.0 m and to reservoirs situated outside protected areas, the permission for construction and the environmental impact assessment is not required. However, one should always keep in mind that even the smallest construction is the work of engineering and should be performed in accordance with the current standards. The increase of available water resources and improvement of water quality demand various measures including those aimed at reducing and limiting water runoff and pollutants transport from the river basins. One of the methods to improve the structure of water balance and the amount of water in rivers is the construction of a large number of small reservoirs, wetland reconstruction etc. Such reservoirs may be divided to: recreational, floristic and faunistic conservation sites, swimming pools, water quality protection (constructed wetlands) and infiltration reservoirs. Reservoirs can have many functions of the economic and natural character. If they are designed and constructed properly they can be a valuable element of the natural landscape in rural areas. Basic data for designing of small reservoirs serving mainly recreational (decorative) purposes and those used for water treatment and ground water recharge are given in the paper. |
Reconstruction and modernization of existing and construction of new reservoirs and ponds in rural areas of Poland |
Bosco Limite | Land use change of a maize-cutivated area, with the costitution of a lowland forest of 25000 square meters. The aim is to create an ecological corridor for the neighboring Nature 2000 Area, with wetlands. Moreover, Bosco Limite is a sperimental project for the groundwater recharge. | Reforestation in Veneto, Italy |
Case study:The Holbina-Dunavat Restoration Project | Holbina-Dunavat area (S=5630 ha) has been studied from 1994 in order to establish a strategy for ecological restoration by a reintegration of the fish farm basins with the surrounding wetlands by opening the ring dikes around the basins. The positive effects are both ecological (wetland restoration, natural habitat and breeding area for fish and aquatic birds) and socio-economical (development of traditional activities, fishing, livestock and reed harvesting, creation of recreational areas for ecotourism) for the local people. | Holbina-Dunavat Restoration Project, Romania |
Runoff Attenuation Features - A guide for all those working in catchment Management | This is a guide to runoff attenuation features (technical issues, environmental considerations etc) based on the work carried out as part of the Belford Catchment Solutions Project. | Rural runoff attenuation in the Belford catchment, UK |
The Órbigo River Restoration Project and its implications in flood risk prevention | WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18 April, 2012. Bucharest-Romania Session 4: Working with institutional stakeholders and other sectors, in particular in land use |
Órbigo River ecological status improvement, Spain |
The regulation of stream water quality and flow by a forested wetland, Kylmäojankorpi, Vantaa. | The Kylmäojankorpi case study represents a research work which aimed to assess whether and how existing forested wetland improves and regulates stream water quality and flow. | Kylmäojankorpi forested wetland, Vantaa, Finland |
Potential Use of Runoff Attenuation Features in small Rural Catchments for Flood Mitigation | Development of a number of small scale, low cost soft engineered flood reduction schemes, designed to store/attenuate rapid runoff in small rural catchments. Design and implimentation of a network of 35 NWRM measures in a Northumberland catchment. To aid understanding of how features impact on downstream flood hazard. | Rural runoff attenuation in the Belford catchment, UK |
La Seymaz | Presentation of the Seymaz river and the renaturation project by Geneva Canton | Renaturation of the Seymaz river, Switzerland |
WFD Surface Water Objectives 2012 | Spreadsheet containing the classification status and environmental objectives for surface water bodies across all River Basin Districts in England and Wales. | Slowing the Flow at Pickering, UK |
Guía técnica para la caracterizacion de las actuaciones a considerar en planes hidrologicos y estudios de viabilidad | Book - https://www.fomento.gob.es/MFOM.CP.Web/detallepublicacion.aspx?idpub=CX1217 | Órbigo River ecological status improvement, Spain |
Ecological Improvement Project in the Órbigo River (Stretch I) | ECRR (European Centre for River Restoration) Newsletter. Includes information about the Órbigo River Restoration Project. | Órbigo River ecological status improvement, Spain |
Integrated Management Plan of The Natural Park Comana | Parcul Natural Comana infiintat prin Hotararea de Guvern nr. 2151 din decembrie 2004 este situat in zona de sud a Romaniei, la distanta aproximativ egala intre Bucuresti si Giurgiu. Decizia de constituire a parcului a fost adoptata in baza documentatiei tehnice si stiintifice elaborate inca din anul 1954 de catre Academia Romana in vederea delimitarii si protejarii a doua arii de importanta floristica deosebita, respectiv Rezervatia Stiintifica de ghimpe (Ruscus aculeatus) si Rezervatia Stiintifica de bujor (Paeonia peregrina). Acestor doua rezervatii li s-a adaugat incepand din anul 2004 Balta Comana, ca rezervatie naturala si zona de protectie avifaunistica. | Restoration on Comana wetlands, Romania |
Ecological restoration in Czech Republic | The main objectives of the mire restoration programme were: (i)restoration of natural (or near-natural) mire hydrology; (ii) enhancement of peat-forming vegetation and processes, (iii) conservation of natural mire biodiversity; and (iv) involvement of the public into local mire conservation. Regarding hydrology, the aim of the restoration was to raise the water table to a natural (pre-drainage) level, decrease the /uctuations, and retain su1cient water in the mires especially during the driest periods. |
Mire restoration within the Sumava National Park, Czech Republic |
Performance Assessment of an Integrated Constructed Wetland-Pond System in Dublin, Ireland |
Chemical results from integrated wetlands, installtion of barley straw. | River Tolka constructed wetland and enhancements, Ireland |
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim | Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. | River basin management of the Ill, France |
Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 | Project Finances, Value, Duration, Localisation, Objective, Activities | Restoration on Comana wetlands, Romania |
Case Study: Improvement of the Ecological Status of the River Órbigo (Leon, Spain) | Dissemination material (video) on the restoration project | Órbigo River ecological status improvement, Spain |
Créer une prairie multi-espèce en zone inondable. Fiche technique n°05 | Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain | |
Ljubljanica connects - Restoration of the Ljubljanica River corridor and improvement of the river's flow regime | Removing barriers to fish migration, enhancing and restoring habitats, improving the water management infrastructure, and putting in place a water monitoring system. | Establishing connectivity in the Ljubljanica river, Slovenia |
Estrategia Naciional de Restauración de Ríos (ENRR). Demarcacion Hidrográfica del Duero | Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. | Órbigo River ecological status improvement, Spain |
The evolution process in Holbina-Dunavat area during restoration works | Mainly during the last decades of the 20th century, the Danube Delta has suffered from human interventions that led to dramatic changes in some areas. These interventions consisted in the dyking of large areas for the purpose of agricultural use, intensive fish-farming and forestry, which resulted in dramatic alterations or disturbances of the water balance. This again had effects on the alteration of natural processes, the ecological balance as well as the characteristic functions of wetlands and led to a deterioration or worse, the loss of area-specific habitats. When the transformation measures were stopped in early 1990, the dyked area covered 97.408 ha (22 %) of the total 482.592 ha. | Holbina-Dunavat Restoration Project, Romania |
Ljubljanica Connects | Project description | Establishing connectivity in the Ljubljanica river, Slovenia |
Analysis of inadequate water quality of the Vonarje reservoir / Sutla Lake and the possibility of restoration and utilisation. | The model for the Sutla (Sotla) river and the Sutlansko Lake reservoir applies a life-cycle concept with the the DPSIR framework approach. | The Vonarje flood storage reservoir in Croatia |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Biodiversity Survey of the Integrated Constructed Wetland at Tolka Valley Park, Finglas, Co. Dublin | Ecological survey | River Tolka constructed wetland and enhancements, Ireland |
REVITALIZATION OF THE CLIMATE IN DRIED - OUT COMMUNITIES IN SLOVAKIA VIA HYDRO - CLIMATE RECOVERY | Recovery of the climate and landscape via integrated rainwater retention in the damaged parts of the country utilizing water retention measures (small dams, retention ponds, rainwater gardens, re-cultivated logging roads) | Recovery of dried out communities in Slovakia |
Vegetated ditches for treatment of surface water with highly fluctuating water regime | Vegetated drainage ditches (VDD) as a type of constructed wetland primarily serve to remove and store excess water associated with irrigation and storm events. Current research suggests using a VDD as an additional practice in the mitigation of surface water pollution. The VDD for water treatment of the Glinscica River was constructed in 2006. The efficiency of the system was evaluated in 2008 and 2009 regarding the reduction of SS, COD, BOD5, NH4-N, NO3-N, NO2-N, TN, ON and TP. The microbiological association developed in the VDD was analyzed with a focus on the identification and quantification of the narG gene as a denitrification indicator. This paper discusses the efficiency of pollution removal and the distribution of the narG gene within the VDD. The results showed that the highly fluctuating water regime was the main reason for the even distribution and abundance of the narG gene throughout the system, regardless of oxygen saturation or the nutrient status of the wastewater. With the exception of SS, pollutant concentrations met the permitted outflow levels. | Pollution Treatment on the Glinščica, Slovenia |
Run-off treatment of highly fluctuating waters with subsurface vegetated drainage ditch and river bed with meanders | Current research suggests using vegetated drainage ditch as an additional practice in the mitigation of surface water pollution. The paper discusses the prototype of vegetated drainage system Glinscica (VDSG) composed of a vege-tated drainage ditch (VDD) and a new river bed with me-anders (RBM) | Pollution Treatment on the Glinščica, Slovenia |