Title | Abstract | Case study(ies) |
---|---|---|
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Yearbook of the Middle Tisza District Water Directorate | Multi-purpose water management development along the Körös-ér, Hungary | |
Biodiversity Survey of the Integrated Constructed Wetland at Tolka Valley Park, Finglas, Co. Dublin | Ecological survey | River Tolka constructed wetland and enhancements, Ireland |
Transferring Water Management Knwoledge How actors, interaction and context influence the effectiveness of Dutch-funded project in Romania |
Thesis as a result of the collaboratiion of the Faculty of Engineering Technology, Department of Water Engineering and Ma nagement (www.utwente.nl/ctw/wem/) and the School of Management and Governance, CSTM: Twente Centre for Studies in Technology andSustainable Development (www.utwente.nl/mb/cstm/). Reflection and discussion part includes also the Ciobarciu case study |
Wetland restoration in Ciobarciu, Romania |
River Basin Management Plan Prut-Barlad | General presentation of the basin, Characterization, Identification of the protected areas, Monitoring, Environmenatl objectives, Economic analysis, programme of Measures, etc. | Wetland restoration in Ciobarciu, Romania |
Case study:The Babina Restoration Project | Until the 20th century vast areas of the Danube Delta faced only minimal human impacts through extensive fishery and reed harvesting. Since then the Danube Delta has undergone multiple human impacts like embankment, channelization and drainage. Moreover, large areas were diked and the polders used for agriculture. The Babina polder (2.100 ha) was reconnected to the Danube in 1994 and recovery has been monitored by the Danube Delta National Institute for Research and Development. Within a few years a redevelopment of the site-specific biodiversity occurred and ecosystem services like nutrient retention and fish recruitment became obvious. Additionally, the reconnected polder enable reed harvesting, grazing, fishing and ecotourism. | Babina Restoration Project, Romania |
Tuning the tide: creating ecological conditions for tidal marsh development in a controlled inundation area. Hydrobiologia 588, 31-43. | The Schelde estuary, characterised as a turbid, polluted and eutrophic system, has nowadays reached a turning point in the restoration of its water quality. During the past century, human activities have reduced the intertidal areas, essential in the estuarine ecosystem for nutrient cycling and the self-cleaning capacity. Today, in combination with a master plan to protect the population from storm surges, an opportunity rises to restore areas with a tidal influence. One specific option of combining safety and ecology is the creation of flood control areas (FCA) under the influence of a controlled reduced tide (CRT). These specific areas will differ in many ways from fully tidal areas. However, these areas can fulfill important ecological functions with effects on aeration, nitrification, denitrification, sedimentation and primary production in the estuary. Opportunities for ecological development within a CRT have been investigated for a specific case. The ecology within a CRT showed to be very case specific, depending e.g. on the morphology of the area, the sluice design and the local water quality. Depending on the sluice design, water quality can be improved and sedimentation can be influenced. Possible measures to design a CRT with a rich habitat variation are discussed. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
Rehabilitation works for the dykes ON Mata Lake | Project description | Ecological Restoration of Mata Radeanu, Romania |
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 1: état des lieux initial et final | The report presents the results of the Contrat de rivière project, which includes Heramnce restoration project. It details initial state and final state regarding indicators linked to water quality, hydromorphological status etc | Restoration of river Hermance, France |
Assessment of instream structures for habitat improvement for two critically endangered fish species | River ecosystems have witnessed a long history of human pressure, particularly the disruption of freshwater fish populations. The awareness of this situation has led to many habitat improvement projects, with a variable degree of success. | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Tolka Valley Greenway opening speech by Lord Mayor | Speech thanking participants and giving site overview | River Tolka constructed wetland and enhancements, Ireland |
Case study:Restoration of Rusenski Lom River near Ivanovo | Application of the principle †œmore space for the river †“ more safety for people† | Floodplain restoration in the Russenski Lom Nature Park, Bulgaria |
Tramos Bajos del Aragon y del Arga | Factsheet filled with data from Natura 2000 data set | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Rainfall interception by Sacramento, Urban Forest. | A rainfall interception study was conducted in Oakland, California to determine the partitioning of rainfall and the chemical composition of precipitation, throughfall, and stemflow. Rainfall interception measurements were conducted on a gingko (Ginkgo biloba) (13.5 m tall deciduous tree), sweet gum (Liquidambar styraciflua) (8.8 m tall deciduous), and lemon tree (Citrus limon) (2.9 m tall broadleaf evergreen). The lemon, ginkgo, and sweet gum intercepted 27.0%, 25.2% and 14.3% of gross precipitation, respectively | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Preclassification of Ecological Quality in the Odelouca catchment area and its use in restoration guidelines | The demands of the Water Framework Directive over the next few years imply considerable effort in the conservation and restoration of river reaches based upon the reliable classification of river corridor conservation status that discloses information on causes of degradation. Using an adaptation of the KT Method, originally developed as part of the National Water Plan, a Map of River Corridor Conservation Status was drawn up for the River Odelouca catchment area that included the definition of existing fluvial reaches using geographic and hydrogeomorphological variables which were then assessed according to the presence of anthropogenic pressures | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Palienes režima atjaunošana Slampes upes lejtece | Collection of articles about habitat management problematic in Latvia | Floodplain restoration of the river Slampe, Latvia |
Ciobarciu Wetland Pilot Project on ecological Reconstruction | Prezentation of the pilot project at the Final Wetlands Workshop of UNDP/GEF Danube Regional Project | Wetland restoration in Ciobarciu, Romania |
Evaluation report Ciobarciu Wetland | Report presenting the main lessons of the project, especially regarding stakeholder participation. It does so by first giving an introduction to the project and explaining the method of the evaluation (chapter 1). It then goes through the results of the project (chapter 2), following the project†™s objectives as described in the project document and quoted in the introduction (chapter 1) of this report. | Wetland restoration in Ciobarciu, Romania |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] | Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration | Órbigo River ecological status improvement, Spain |
Evaluating the Response of Biological Assemblages as Potential Indicators for Restoration Measures in an Intermittent Mediterranean River. | Bioindicators are essential for detecting environmental degradation and for assessing the success of river restoration initiatives. River restoration projects require the identification of environmental and pressure gradients that affect the river system under study and the selection of suitable indicators to assess habitat quality before, during and after restoration. We assessed the response of benthic macroinvertebrates, fish, bird and macrophyte assemblages to environmental and pressure gradients [...] | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Odense Å ved Brobyværk | De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. | Restoration of the Odense river, Denmark |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Mata Radeanu, Romania |
Good practices handbook | The INTERREG IVC project WATER CoRe (Water scarcity and droughts; coordinated actions in European regions) provides an exchange platform on water scarcity and drought issues. Due to climate change effects, water scarcity is foreseen to affect the European Union citizens on ecological, economic and social issues, at local and regional level. New and coordinated strategies and policies are required, to mitigate the climate change impact on our economy and our life. Thus, the main objective of the project is the exchange of experiences and the transfer of good practices between the regions partners in the project and the improvement of topic related management standards all around Europe. | Multi-purpose water management development along the Körös-ér, Hungary |
Sutcliffe Park Briefing pack - External | Draft note for external distribution outlining the sitcliffe Park site, key messages | Restoring the River Quaggy in London, UK |
Case Study: Lippenbroek Regulated Tidal Exchange Scheme | The Lippenbroek Regulated Tidal Exchange (RTE) scheme is a pilot scheme for the so-called controlled reduced tide (CRT) concept which Belgian authorities are planning to apply to (sections of) numerous flood storage areas in the near future to create tidal habitats (e.g. at Kruibeke, where the first inundation will likely occur in 2011). The CRT concept involves the use of two exchange mediums, one high inlet medium (e.g. a weir/spillway or sluice/culvert), and a lower outlet medium, which may be capped with a gravity controlled sluice gate. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
Naturschutzgroßprojekt Lenzener Elbtalaue | Website of the project. | Dyke relocation on the river Elbe near Lenzen, Germany |
DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok N.R. | Restoration was done by improving the lagoon's water circulation, through the removal of sediments, the creation of a new marsh, flooding an area previously used for agriculture and the installation of equipment to control and regulate the inflow and outflow of water. | DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok Nature Reserve, Slovenia |
Natural Park of the Lower Prut Floodplain - Project LIFE 05 NAT/RO /000155 | Description of the project. | Ecological Restoration of Mata Radeanu, Romania |
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
The Tolka catchment - fulfilling multiple roles: local government perspectives | Presentation on Tolka Valley Park, showing ecological measures and effects | River Tolka constructed wetland and enhancements, Ireland |
A predictive modelling tool for assessing climate, land use and hydrological change on reservoir physicochemical and biological properties. | The measures implemented focus on the use of bio-engineering or natural techniques for rehabilitation of riparian buffer zones and river banks | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Different scales of analysis in classifying streams: from a multimetric towards an integrated system approach | Two different approaches to define the ecological status of several catchments (NW Portugal) are compared. At a coarser scale, all the stream network was classed using GIS according to several variables related to: a) biotic indicators, such as native and exotic fish species, benthic biotic index and characteristics of the riparian corridor); b) chemical indicators of contamination, where an estimation of industrial and urban organic loads and water quality was included. This methodology is preceded by a typological classification so that a determination of the ecological status can be made separately of each of the physical units integrated in the watercourse. | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Recalificacion de galerías de ribera en el área de la presa del Odelouca: de la concesion a la intervencion | El Espacio del Sudoeste Europeo se enfrenta a diversos problemas en la gestión de los recursos hídricos, tanto en lo que se refiere a su calidad y al déficit entre la oferta y la demanda en las cuencas hidrográficas, como a los problemas relacionados con la prevención de riesgos y alteraciones climáticas. El proyecto RICOVER tiene por objetivo definir e implementar, a través de intervenciones piloto, estrategias y metodologías conjuntas de protección y conservación de los ríos del SUDOE. Para ello, se tendrán en cuenta, entre otros elementos, las características naturales y la biodiversidad, la preservación de hábitats prioritarios y del Patrimonio de la Red Natura 2000, la importancia de los ríos como corredores ecológicos y su contribución para el ciclo natural del agua y la necesidad de la riqueza fluvial y su valor económico. | Natural bank stabilization and riparian buffer galleries along the Odelouca River, Portugal |
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats | "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Weigall Road and Sutcliffe park | Site description and details of dimensions of NWRM measures | Restoring the River Quaggy in London, UK |
ES2200035 -Tramos Bajos del Aragon y del Arga | Natura 2000 data set for lower reaches of the Aragon and Arga Rivers | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Project Nieuwsbrief - Vallei van de Grote Nete | Eén van de hoekstenen van het hedendaagse waterbeleid is het principe ‘vasthouden-bergen-afvoeren’ zoals ook blijkt uit het bekkenbeheerplan. Door water maximaal vast te houden aan de bron of ter plaatse te laten infiltreren, wordt wateroverlast niet langer afgewenteld op stroomafwaarts gelegen gebieden. Diezelfdestrategie moet ook voor een oplossing zorgen in de strijd tegen verdroging die in het licht van een mogelijke klimaatsverandering wel eens belangrijk zou kunnen worden. | Floodplain reconnection in the Vallei van de Grote Nete, Belgium |
DANUBE FORESTS - Conservation and management of Danube floodplain forests | Measures for the control and elimination of invasive plant species, the promotion of natural regeneration and selective tree cuttin | Preservation of floodplain forests, Slovakia |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Mata Radeanu, Romania |
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies | Planning and implementing green infrastructure on a regional level in Romania | Restoration on Comana wetlands, Romania |
Evolution of Babina polder after restoration works |
The Danube Delta Biosphere Reserve is an area where governmental decision makers, scientists and local communities co-operate to develop a pilot programme for the administration of the territory and the waters. The objective is to harmonize the requirements of the local populations with the necessity for conservation of natural processes and biological resources. |
Babina Restoration Project, Romania |
Dijkteruglegging Lent | In the vicinity of Lent the existing dike is moved land inwards and in this new area a new trench is dug. This will widen the river bend between Nijmegen and Lent and will assure better water flow off during high tide situations. The estimated drop in water levels in extreme situation is up to 35 cm. | Room for the River: Nijmegen dike relocation, Netherlands |
Hochwasser: Rückverlegung des Deichs bewährt sich | Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt.Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt. | Dyke relocation on the river Elbe near Lenzen, Germany |
Plan Nacional de Restauracion de Ríos | Este Ministerio está desarrollando, en consonancia con la Directiva marco del agua y la Directiva de evaluación y gestión de los riesgos de inundación, la Estrategia Nacional de Restauración de Ríos, un conjunto de actuaciones con el fin de conservar y recuperar el buen estado de nuestros ríos, minimizar los riesgos de inundación, potenciar su patrimonio cultural, fomentar el uso racional del espacio fluvial e impulsar el desarrollo sostenible del medio rural. |
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
The Órbigo River Restoration Project and its implications in flood risk prevention | WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18 April, 2012. Bucharest-Romania Session 4: Working with institutional stakeholders and other sectors, in particular in land use |
Órbigo River ecological status improvement, Spain |
CONFERENCE "ECOLOGICALNETWORKS" Introduction to experiences and approaches | Includes prezentation on the wetlands in the Prut basin, among others the Ciobarciu wetland project | Wetland restoration in Ciobarciu, Romania |