Small scale measures under the "Waters neighborhood Days" in Hamburg - Factsheet | The core of the activities carried out on Osterbek river was the installation of flow control arms at mean water level. Due to the width of the bundle of sticks of 2 to 2.5 m, they should contribute to a significant narrowing of the broad streambed. They were attached to three pegs that were fixed at the ground. In order to avoid under- or backflushing, the brushwood were strengthened with stones, coarse and fine gravel. A total of 14 flow control arms were installed at equal distances approximately transverse to the direction of flow on the left and right bank . In a wide section an island of gravel and coarse of about 15 m was applied. Also in the Middle Bille flow control arms were installed consisting of dead wood, stones and gravel. The brushwood was shortened to a length of about 1 m and transversely and with a slight tilt attached to two pegs in the sole. The height of the installment was also based on mean water level |
Small scale measures under the 'Waters neighborhood Days' in Hamburg, Germany |
Notranjski regijski park, Layman's Report | Layman's Report (project report intended for wider public) presents background, goals and purpose of the project, planned solutions, actions and result. At the end it describes the meaning and the message of the project. | Conservation on Lake Cerknica, Slovenia |
Odense Å ved Brobyværk | De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. | Restoration of the Odense river, Denmark |
LIFE Projekt Auenverbund Obere Drau | Detailed project description of the former LIFE project on the river Drau. We needed basic information on the region e.g. rainfall, temperature, runoff | Revitalization of the upper Drau River in Austria |
Sutcliffe Park Briefing pack - External | Draft note for external distribution outlining the sitcliffe Park site, key messages | Restoring the River Quaggy in London, UK |
Restauration des prairies humides le long de l'Ernz Blanche entre Altinster et Larochette | Feasibility study of a re-meandring project of the Ernz Blanche river. | Restoration of the Ernz Blanche river, Luxemburg |
Case study: Biomura LIFE06NAT/SI/000066 | The Lippenbroek Regulated Tidal Exchange (RTE) scheme is a pilot scheme for the so-called controlled reduced tide (CRT) concept which Belgian authorities are planning to apply to (sections of) numerous flood storage areas in the near future to create tidal habitats (e.g. at Kruibeke, where the first inundation will likely occur in 2011). The CRT concept involves the use of two exchange mediums, one high inlet medium (e.g. a weir/spillway or sluice/culvert), and a lower outlet medium, which may be capped with a gravity controlled sluice gate. | Conservation of Mura banks, Slovenia |
Reconstitution des écoulements de surface de deux affluents temporaires de la Clauge amont | Morphological restoration of temporary watercourses in the National Forest of Chaux | |
Effect of meander restoration on macroinvertebratebiodiversity: the case of the Borová stream(Blanskí½ Les, Czech Republic) | This study brings a view on the effects of restoration of a formerly channelized small submontane stream situated in the Blanský Les Protected Landscape Area (South Bohemia, Czech Republic) on macroinvertebrate assemblages as an indicator group. The restoration project was carried out during two stages (1998 and 2000). It consisted of excavating a new channel to restore the historic meandering pattern. The evaluation of this project is primarily based on the comparison of composition between pre-restoration (1995) and post-restoration (2000–2003) macroinvertebrate samples focusing on species richness, species composition, and representation of rare Ephemeroptera and Plecoptera species. The analyses showed a substantial increase in species richness that was especially prominent shortly after the restoration intervention. This increase was not only due to the creation of lentic habitats, but was even observed at every single sampling site of the stream. The DCA ordination of species composition of the pre- and post-restoration sites indicated a considerable increase in the between-site diversity. This was apparently caused mainly by the establishing of lentic habitats, whereas diversity of lotic sites showed only a slight increase, which was most prominent during the last year of the sampling period. The shift in the species composition was profound for lotic sites as well. Although the restoration intervention considerably increased species richness and markedly changed species composition, there was no detectable increase of rare or vulnerable Ephemeroptera and Plecoptera species. | Revitalisation of the Borova stream, Czech Republic |
Linking floodplain hydraulics and sedimentation patterns along arestored river channel: River Odense, Denmark | The links between floodplain hydraulics and deposition of sediment,organic matter and phosphorus were investigated along a 6 km re-meandered channel section of RiverOdense, Denmark. A 2D dynamic river and floodplain model was set up for the investigated floodplainarea. The flow model was validated against in situ measurements of flow velocities and depths duringa one-day field campaign in January 2012. The predicted duration of inundations, distances to inflow, flow velocities, and informationon microtopography were compared with sedimentation patterns on the floodplain. Three distinct flowregimes were predicted by the hydraulic model and were classified as small, medium and large inundation events according to spatial extent and inundation depth. The model predicts spatially and temporally changing zones of confluence on the floodplain due to variations in inundation depth. | Restoration of the Odense river, Denmark |
The Costuleni Wetland Project Plan | Project concept including project objectives, planning and organization, budget and financing | Wetland restoration in Ciobarciu, Romania |
Romanian Experiences Regarding Ecological Restoration in Danube Floodplain and Delta | Presentation of Romanian experiences | Fortuna Restoration Project in the Danube Delta, Romania |