Title | Abstract | Case study(ies) |
---|---|---|
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 1: état des lieux initial et final | The report presents the results of the Contrat de rivière project, which includes Heramnce restoration project. It details initial state and final state regarding indicators linked to water quality, hydromorphological status etc | Restoration of river Hermance, France |
www.symasol.fr | The website presents all the projects the SYMASOL is responsible for, particularly the Contrat de rivière in which frame this precise measure take place. | Restoration of river Hermance, France |
Contrat de rivières transfrontalier du sud-ouest lémanique 2006-2012, Etude, bilan, évaluation et prospective, phase 2: bilan technique et financier | The reports presents the technical and financial results of the Contrat de rivière project | Restoration of river Hermance, France |
Kretinga Special plan and Stormwater Treatment, Akmena-Dane, Lithuania, Report 4.3.3. | †¢ This is the first time that this type of ecological adapted stormwater investments have been implemented in Lithuania. If they function as well as predicted and can be disseminated through appropriate channels, there should be good possibilities to introduce similar investments in other Lithuanian towns. †¢ The stormwater Special Plan developed introduces a new approach towards more sustainable stormwater solution from an environmental perspective. A next step would be to introduce likewise Special Plans in other towns/cities in the south Baltic Sea area. If more towns would follow the example by Kretinga this could, in a long term, have a significant positive impact of decreasing harmful substances to the Baltic Sea. |
Ecological adapted stormwater treatment in Kretinga town, Lithuania |
Nieuwe stad, schoon water | a design of a sustainable water management system in the Leische Rijn area includes ecological, hydrological and biological impacts | Leidsche Rijn sustainable urban development, Netherlands |
Voorbereiding praktijkonderzoek verticaal doorstroomd hylofytenfilter | study practical case vertical flow reedbed. Conclusions of the literature research and research of the Leidsche Rijn. ALso conclusions of laboratory extra research on different layouts of the filter and different phosphate binding materials. Balance-tests and column-tests were done. | Leidsche Rijn sustainable urban development, Netherlands |
Vers un schéma de gestion globale de l'Ill domaniale entre Colmar et Strasbourg, Synd'Ill Huttenheim | Presentation of the main problems and challenges of the Ill River. By ecosystem services costs for measures are justified. | River basin management of the Ill, France |
Etude diagnostic et élaboration d'un schéma de gestion globale de l'ill domaniale et ses lits mineur et majeur | Study analysing the main problems on the Ill river and making suggestions to solve these problems by a mix of NWRM and classical measures. Moreover, socio-economic and legal aspects are taken into account. | River basin management of the Ill, France |
Annexe 12 - Planning Schéma de gestion de l'ill 2014-2024 | Overview on costs | River basin management of the Ill, France |
Approval for environmental terms for implementation of forest hydroeconomy works in mountainous areas in part of the river basin of Xiropotamos | The retention measures include afforastation and planting as well as construction of small scale dams to decrease the stream gradient in order to decrease soil erosion and flood events. | Increasing water retention through afforestation, landscaping and reducing the stream gradient in Xiropotamos River Basin, Greece |
Green potential of a constructed wetland with reed bed filters on a 172 ha urban project near Reims (France). Project evolution analysis | A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. The characteristics of this detention pond have drastically changed along the design process: the first hypothesis were based upon a deep concrete tank, but a constructed wetland has finally been chosen. This paper deals with the constructed wetland characteristics itself on the ecological point of view (deepness, shape...). It also points the design process that allowed such an evolution, thanks to both the designer proposals and the public authority requirements | Constructed wetland with reed bed filters near Reims, France |
Potentiel écologique d’un ouvrage de rétention et de filtration des eaux pluviales sur une opération de 172 hectares (Reims) ; analyse de la genèse du projet | A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. | Constructed wetland with reed bed filters near Reims, France |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Programme de restauration fonctionnelle St-Ruph-Glière-Eau-morte. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte |