Title | Abstract | Case study(ies) |
---|---|---|
Potentiel écologique d’un ouvrage de rétention et de filtration des eaux pluviales sur une opération de 172 hectares (Reims) ; analyse de la genèse du projet | A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. | Constructed wetland with reed bed filters near Reims, France |
Improvement of the navigation conditions on the Danube between Calarasi and Braila KM 375-KM 175 | Improvement of the navigation conditions on the Danube between Calarasi and Braila , by ensuring the minimum depths of 2.5 m of the fairway recommended by the Danube Commission during the entire year, including the dry season. |
Improvement of the navigation conditions on the Danube between Calarasi and Braila, Romania |