Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 52 results found

Sector

  • Hydro Morphology (45)
  • Forest (17)
  • Urban (13)
  • Agriculture (4)

NWRM(s) implemented

  • Wetland restoration and management (151)
  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Stream bed re-naturalization (53)
  • Basins and ponds (35)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Riverbed material renaturalization (40)
  • (-) Retention Ponds (12)
Title Abstract Case study(ies)
Potentiel écologique d’un ouvrage de rétention et de filtration des eaux pluviales sur une opération de 172 hectares (Reims) ; analyse de la genèse du projet A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. Constructed wetland with reed bed filters near Reims, France
Improvement of the navigation conditions on the Danube between Calarasi and Braila KM 375-KM 175 Improvement of the navigation conditions on the Danube between Calarasi and Braila , by
ensuring the minimum depths of 2.5 m of the
fairway recommended by the Danube
Commission during the entire year, including the dry season.
Improvement of the navigation conditions on the Danube between Calarasi and Braila, Romania

Pagination

  • Previous page ‹‹

Funded by EU
Service contract funded by the European Commission((Directorate General Environment))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau | Join the NWRM group on Join us in Linked In

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18