Title | Abstract | Case study(ies) |
---|---|---|
Piano di Gestione Basso Aurino †“ Relazione sintetica degli interventi realizzati in localití Rienzfield, Gatzaue e Molini di Tures (2002-2011) | River restoration measures were implemented along the Aurino stream as part of the Aurino management plan. Interventions were grouped in Work Packages and were implemented in different moments within the years 2003-2011. The objectives were flood protection and, secondarily, the improvement of the natural environment. Different interventions were implemented to widen the river bed, such as for example: (i) forests were cleared in the relevant areas, to add space to the river bed; (ii) (artificial) river banks were lowered and enlarged; (iii) re-activation or creation of lateral river branches; (iv) measures to raise the river bed†™s level. | River restoration of the lower Aurino in Italy |
Restoring Europe's Rivers - Case Study Ciobarciu Wetland Project | Case study pesentation with additional deatails | Wetland restoration in Ciobarciu, Romania |
Les Marais Communaux du Marais Poitevin | Website presenting the project, with links to newsletters | Flood meadows in the Marais Poitevin, France |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Yearbook of the Middle Tisza District Water Directorate | Multi-purpose water management development along the Körös-ér, Hungary | |
Transferring Water Management Knwoledge How actors, interaction and context influence the effectiveness of Dutch-funded project in Romania |
Thesis as a result of the collaboratiion of the Faculty of Engineering Technology, Department of Water Engineering and Ma nagement (www.utwente.nl/ctw/wem/) and the School of Management and Governance, CSTM: Twente Centre for Studies in Technology andSustainable Development (www.utwente.nl/mb/cstm/). Reflection and discussion part includes also the Ciobarciu case study |
Wetland restoration in Ciobarciu, Romania |
River Basin Management Plan Prut-Barlad | General presentation of the basin, Characterization, Identification of the protected areas, Monitoring, Environmenatl objectives, Economic analysis, programme of Measures, etc. | Wetland restoration in Ciobarciu, Romania |
Case study:The Babina Restoration Project | Until the 20th century vast areas of the Danube Delta faced only minimal human impacts through extensive fishery and reed harvesting. Since then the Danube Delta has undergone multiple human impacts like embankment, channelization and drainage. Moreover, large areas were diked and the polders used for agriculture. The Babina polder (2.100 ha) was reconnected to the Danube in 1994 and recovery has been monitored by the Danube Delta National Institute for Research and Development. Within a few years a redevelopment of the site-specific biodiversity occurred and ecosystem services like nutrient retention and fish recruitment became obvious. Additionally, the reconnected polder enable reed harvesting, grazing, fishing and ecotourism. | Babina Restoration Project, Romania |
Tuning the tide: creating ecological conditions for tidal marsh development in a controlled inundation area. Hydrobiologia 588, 31-43. | The Schelde estuary, characterised as a turbid, polluted and eutrophic system, has nowadays reached a turning point in the restoration of its water quality. During the past century, human activities have reduced the intertidal areas, essential in the estuarine ecosystem for nutrient cycling and the self-cleaning capacity. Today, in combination with a master plan to protect the population from storm surges, an opportunity rises to restore areas with a tidal influence. One specific option of combining safety and ecology is the creation of flood control areas (FCA) under the influence of a controlled reduced tide (CRT). These specific areas will differ in many ways from fully tidal areas. However, these areas can fulfill important ecological functions with effects on aeration, nitrification, denitrification, sedimentation and primary production in the estuary. Opportunities for ecological development within a CRT have been investigated for a specific case. The ecology within a CRT showed to be very case specific, depending e.g. on the morphology of the area, the sluice design and the local water quality. Depending on the sluice design, water quality can be improved and sedimentation can be influenced. Possible measures to design a CRT with a rich habitat variation are discussed. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
Rehabilitation works for the dykes ON Mata Lake | Project description | Ecological Restoration of Mata Radeanu, Romania |
Case study:Restoration of Rusenski Lom River near Ivanovo | Application of the principle †œmore space for the river †“ more safety for people† | Floodplain restoration in the Russenski Lom Nature Park, Bulgaria |
Tramos Bajos del Aragon y del Arga | Factsheet filled with data from Natura 2000 data set | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
SMIVAL Rapport d'activité 2011 (Activity report 2011) | Raison première de la création du SMIVAL, la prévention des inondations constitue une large majorité des activités du syndicat. Implanté localement, le SMIVAL constitue une interface entre les habitants, les élus et les administrations de l’État et des collectivités. Son rôle porte ainsi sur la mise en exergue des besoins du bassin, sur la déclinaison locale des politiques nationales et régionales, sur la mise en œuvre d’aménagements et sur la sensibilisation des populations et des élus locaux. | Floodbreaking hedgerows in Southern France |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
L’eau en Loire Bretagne, les trophées de l’eau en Loire Bretagne 2009 | Reconstruction of the hedgerow on the Léguer basin | |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Interventi estesi di riqualificazione fluviale lungo gli affluenti del medio corso del Fiume Dese | The Veneto Region, through the †œPlan for diffuse pollution prevention and restoration of water in the draining basins of the Venice Lagoon† financed measures of re-calibration of riverbeds aimed at the renaturation of the hydraulic web, to increase the time of permanence of water and phytodepuration processes in the draining basin. In this framework, the Consorzio Acque Risorgive implemented a series of extended interventions on the area under its responsibility. This case study was implemented as part of these interventions. In particular, it aimed at re-structuring the effluents of the mid course of the Dese river (Rio S. Martino, Rio S. Ambrogio and Scolo Desolino). Such effluents are mostly draining channels, draining water from agricultural fields to the Dese river. The primary objective was the reduction of the amount of N and P reaching the Venice lagoon through phytodepuration. However, at the same time the project carried out the restoration of the draining channel web aimed at reducing flooding issues affecting the area. The following measures were implemented: †¢ Riparian buffer zones †¢ Creation of wetlands †¢ River bed enlargement †¢ Creation and reconnection of floodplain and new buffer strips †¢ Channel naturalization, creation of new meandering channel |
Restructuring the effluent web in Italy |
Le projet Léguer Bocage | Reconstruction of the hedgerow on the Léguer basin | |
Palienes režima atjaunošana Slampes upes lejtece | Collection of articles about habitat management problematic in Latvia | Floodplain restoration of the river Slampe, Latvia |
Ciobarciu Wetland Pilot Project on ecological Reconstruction | Prezentation of the pilot project at the Final Wetlands Workshop of UNDP/GEF Danube Regional Project | Wetland restoration in Ciobarciu, Romania |
Evaluation report Ciobarciu Wetland | Report presenting the main lessons of the project, especially regarding stakeholder participation. It does so by first giving an introduction to the project and explaining the method of the evaluation (chapter 1). It then goes through the results of the project (chapter 2), following the project†™s objectives as described in the project document and quoted in the introduction (chapter 1) of this report. | Wetland restoration in Ciobarciu, Romania |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] | Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration | Órbigo River ecological status improvement, Spain |
Odense Å ved Brobyværk | De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. | Restoration of the Odense river, Denmark |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Mata Radeanu, Romania |
Good practices handbook | The INTERREG IVC project WATER CoRe (Water scarcity and droughts; coordinated actions in European regions) provides an exchange platform on water scarcity and drought issues. Due to climate change effects, water scarcity is foreseen to affect the European Union citizens on ecological, economic and social issues, at local and regional level. New and coordinated strategies and policies are required, to mitigate the climate change impact on our economy and our life. Thus, the main objective of the project is the exchange of experiences and the transfer of good practices between the regions partners in the project and the improvement of topic related management standards all around Europe. | Multi-purpose water management development along the Körös-ér, Hungary |
Sutcliffe Park Briefing pack - External | Draft note for external distribution outlining the sitcliffe Park site, key messages | Restoring the River Quaggy in London, UK |
Case Study: Lippenbroek Regulated Tidal Exchange Scheme | The Lippenbroek Regulated Tidal Exchange (RTE) scheme is a pilot scheme for the so-called controlled reduced tide (CRT) concept which Belgian authorities are planning to apply to (sections of) numerous flood storage areas in the near future to create tidal habitats (e.g. at Kruibeke, where the first inundation will likely occur in 2011). The CRT concept involves the use of two exchange mediums, one high inlet medium (e.g. a weir/spillway or sluice/culvert), and a lower outlet medium, which may be capped with a gravity controlled sluice gate. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
Komplex élőhelyrehabilitációs tevékenység az Őrségi Nemzeti Park Igazgatóság működési területén.Complex habitat reconstruction in the Őrség National Park | There are three measures applied in the national park area primarily for nature rehabilitation, but all measures have water retention aspects. (1) Creating ponds in the forest where run off from forestry roads are collected. The main goal is to create safe breeding ground for reptiles instead of temporary sumps on the roads. 50 ponds created with the total surface 1,100m2. (2) Re-vegetating shelterbelts (groves, wetlands) in agricultural land where 50 years ago these landscape elements were destroyed for agro efficiency reasons. 12 areas of revegetation, their total cover 12,000m2 in an area of 153 ha. (3) Building closures in the drainage channels to enable the flooding of the alder (Alnus) forest and wet meadow to improve their natural quality an important site in the ecological corridor along the stream Csörnöc. The drainage channel's watershed is 42 ha. |
Diverse Habitat Reconstructions in the Őrség National Park in Hungary |
Naturschutzgroßprojekt Lenzener Elbtalaue | Website of the project. | Dyke relocation on the river Elbe near Lenzen, Germany |
DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok N.R. | Restoration was done by improving the lagoon's water circulation, through the removal of sediments, the creation of a new marsh, flooding an area previously used for agriculture and the installation of equipment to control and regulate the inflow and outflow of water. | DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok Nature Reserve, Slovenia |
Natural Park of the Lower Prut Floodplain - Project LIFE 05 NAT/RO /000155 | Description of the project. | Ecological Restoration of Mata Radeanu, Romania |
Bocage | Reconstruction of the hedgerow on the Léguer basin | |
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats | "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Exemple d’une cogestion réussie sur un marais breton | Restoration of the Black Marsh of Saint-Coulban | |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Weigall Road and Sutcliffe park | Site description and details of dimensions of NWRM measures | Restoring the River Quaggy in London, UK |
ES2200035 -Tramos Bajos del Aragon y del Arga | Natura 2000 data set for lower reaches of the Aragon and Arga Rivers | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Project Nieuwsbrief - Vallei van de Grote Nete | Eén van de hoekstenen van het hedendaagse waterbeleid is het principe ‘vasthouden-bergen-afvoeren’ zoals ook blijkt uit het bekkenbeheerplan. Door water maximaal vast te houden aan de bron of ter plaatse te laten infiltreren, wordt wateroverlast niet langer afgewenteld op stroomafwaarts gelegen gebieden. Diezelfdestrategie moet ook voor een oplossing zorgen in de strijd tegen verdroging die in het licht van een mogelijke klimaatsverandering wel eens belangrijk zou kunnen worden. | Floodplain reconnection in the Vallei van de Grote Nete, Belgium |
DANUBE FORESTS - Conservation and management of Danube floodplain forests | Measures for the control and elimination of invasive plant species, the promotion of natural regeneration and selective tree cuttin | Preservation of floodplain forests, Slovakia |
Some aspects concerning wetland restoration programs in the Prut River Basin | The paper presents some aspects concerning the technical solutions identified for the ecological restoration of some wetlands from the Lower Prut floodplain, located both on Romanian and Moldavian sides, implemented within some international environmental projects. | Ecological Restoration of Mata Radeanu, Romania |
Financing Natura 2000 in 2014-2020: Guidance Handbook, Part II, Case studies | Planning and implementing green infrastructure on a regional level in Romania | Restoration on Comana wetlands, Romania |
Evolution of Babina polder after restoration works |
The Danube Delta Biosphere Reserve is an area where governmental decision makers, scientists and local communities co-operate to develop a pilot programme for the administration of the territory and the waters. The objective is to harmonize the requirements of the local populations with the necessity for conservation of natural processes and biological resources. |
Babina Restoration Project, Romania |
Dijkteruglegging Lent | In the vicinity of Lent the existing dike is moved land inwards and in this new area a new trench is dug. This will widen the river bend between Nijmegen and Lent and will assure better water flow off during high tide situations. The estimated drop in water levels in extreme situation is up to 35 cm. | Room for the River: Nijmegen dike relocation, Netherlands |
Hochwasser: Rückverlegung des Deichs bewährt sich | Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt.Eine renaturierte Auenlandschaft mit großer Artenvielfalt und ein wirksamer Schutz vor Hochwasser – das sind die Ergebnisse des Naturschutzgroßprojekts „Lenzener Elbtalaue“. Unter der Leitung des Biologen Dr. Christian Damm vom KIT wurde der Elbdeich bei Lenzen (Brandenburg) ins Hinterland verlegt. Das bis jetzt größte Rückdeichungsprojekt Deutschlands hat nun eine wichtige Bewährungsprobe bestanden: Beim Elbe-Hochwasser 2013 hat die Überflutungsfläche zwischen altem und neuem Deich das Umland vor Schäden bewahrt. | Dyke relocation on the river Elbe near Lenzen, Germany |
Plan Nacional de Restauracion de Ríos | Este Ministerio está desarrollando, en consonancia con la Directiva marco del agua y la Directiva de evaluación y gestión de los riesgos de inundación, la Estrategia Nacional de Restauración de Ríos, un conjunto de actuaciones con el fin de conservar y recuperar el buen estado de nuestros ríos, minimizar los riesgos de inundación, potenciar su patrimonio cultural, fomentar el uso racional del espacio fluvial e impulsar el desarrollo sostenible del medio rural. |
Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
The Órbigo River Restoration Project and its implications in flood risk prevention | WGF Thematic Workshop: Stakeholder Involvement in Flood Risk Management. 17, 18 April, 2012. Bucharest-Romania Session 4: Working with institutional stakeholders and other sectors, in particular in land use |
Órbigo River ecological status improvement, Spain |
CONFERENCE "ECOLOGICALNETWORKS" Introduction to experiences and approaches | Includes prezentation on the wetlands in the Prut basin, among others the Ciobarciu wetland project | Wetland restoration in Ciobarciu, Romania |
Agrarumweltprogramm der Stadt HeilbronnAktualisierte Richtlinie für das AckerrandstreifenprogrammStaatliche Beihilfe Nummer N539/2009, 2010-2013 | Reglementation concerning the field margins programme | Field margins in Heilbronn, Germany |