Ecological Restoration of Comana Wetlands - Giurgiu County, Cod SMIS - CSNR 6725 | Project Finances, Value, Duration, Localisation, Objective, Activities | Restoration on Comana wetlands, Romania |
Créer une prairie multi-espèce en zone inondable. Fiche technique n°05 | Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain | |
Estrategia Naciional de Restauración de Ríos (ENRR). Demarcacion Hidrográfica del Duero | Descriptive fiche on the participation process carried out within the framework of the Órbigo river restoration project. | Órbigo River ecological status improvement, Spain |
Piano di Gestione Basso Aurino †“ Relazione sintetica degli interventi realizzati in localití Rienzfield, Gatzaue e Molini di Tures (2002-2011) | River restoration measures were implemented along the Aurino stream as part of the Aurino management plan. Interventions were grouped in Work Packages and were implemented in different moments within the years 2003-2011. The objectives were flood protection and, secondarily, the improvement of the natural environment. Different interventions were implemented to widen the river bed, such as for example: (i) forests were cleared in the relevant areas, to add space to the river bed; (ii) (artificial) river banks were lowered and enlarged; (iii) re-activation or creation of lateral river branches; (iv) measures to raise the river bed†™s level. | River restoration of the lower Aurino in Italy |
Restoring Europe's Rivers - Case Study Ciobarciu Wetland Project | Case study pesentation with additional deatails | Wetland restoration in Ciobarciu, Romania |
Les Marais Communaux du Marais Poitevin | Website presenting the project, with links to newsletters | Flood meadows in the Marais Poitevin, France |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Documento 1_ Memoria (Clave 02.434-229/2111) (Órbigo River ecologic status improvement. Stretch I (León). Document 1 (Technical Report) | Project Report | Órbigo River ecological status improvement, Spain |
Yearbook of the Middle Tisza District Water Directorate | Multi-purpose water management development along the Körös-ér, Hungary | |
Biodiversity Survey of the Integrated Constructed Wetland at Tolka Valley Park, Finglas, Co. Dublin | Ecological survey | River Tolka constructed wetland and enhancements, Ireland |
Transferring Water Management Knwoledge How actors, interaction and context influence the effectiveness of Dutch-funded project in Romania |
Thesis as a result of the collaboratiion of the Faculty of Engineering Technology, Department of Water Engineering and Ma nagement (www.utwente.nl/ctw/wem/) and the School of Management and Governance, CSTM: Twente Centre for Studies in Technology andSustainable Development (www.utwente.nl/mb/cstm/). Reflection and discussion part includes also the Ciobarciu case study |
Wetland restoration in Ciobarciu, Romania |
River Basin Management Plan Prut-Barlad | General presentation of the basin, Characterization, Identification of the protected areas, Monitoring, Environmenatl objectives, Economic analysis, programme of Measures, etc. | Wetland restoration in Ciobarciu, Romania |
Case study:The Babina Restoration Project | Until the 20th century vast areas of the Danube Delta faced only minimal human impacts through extensive fishery and reed harvesting. Since then the Danube Delta has undergone multiple human impacts like embankment, channelization and drainage. Moreover, large areas were diked and the polders used for agriculture. The Babina polder (2.100 ha) was reconnected to the Danube in 1994 and recovery has been monitored by the Danube Delta National Institute for Research and Development. Within a few years a redevelopment of the site-specific biodiversity occurred and ecosystem services like nutrient retention and fish recruitment became obvious. Additionally, the reconnected polder enable reed harvesting, grazing, fishing and ecotourism. | Babina Restoration Project, Romania |
REVITALIZATION OF THE CLIMATE IN DRIED - OUT COMMUNITIES IN SLOVAKIA VIA HYDRO - CLIMATE RECOVERY | Recovery of the climate and landscape via integrated rainwater retention in the damaged parts of the country utilizing water retention measures (small dams, retention ponds, rainwater gardens, re-cultivated logging roads) | Recovery of dried out communities in Slovakia |
Tuning the tide: creating ecological conditions for tidal marsh development in a controlled inundation area. Hydrobiologia 588, 31-43. | The Schelde estuary, characterised as a turbid, polluted and eutrophic system, has nowadays reached a turning point in the restoration of its water quality. During the past century, human activities have reduced the intertidal areas, essential in the estuarine ecosystem for nutrient cycling and the self-cleaning capacity. Today, in combination with a master plan to protect the population from storm surges, an opportunity rises to restore areas with a tidal influence. One specific option of combining safety and ecology is the creation of flood control areas (FCA) under the influence of a controlled reduced tide (CRT). These specific areas will differ in many ways from fully tidal areas. However, these areas can fulfill important ecological functions with effects on aeration, nitrification, denitrification, sedimentation and primary production in the estuary. Opportunities for ecological development within a CRT have been investigated for a specific case. The ecology within a CRT showed to be very case specific, depending e.g. on the morphology of the area, the sluice design and the local water quality. Depending on the sluice design, water quality can be improved and sedimentation can be influenced. Possible measures to design a CRT with a rich habitat variation are discussed. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
Rehabilitation works for the dykes ON Mata Lake | Project description | Ecological Restoration of Mata Radeanu, Romania |
Run-off treatment of highly fluctuating waters with subsurface vegetated drainage ditch and river bed with meanders | Current research suggests using vegetated drainage ditch as an additional practice in the mitigation of surface water pollution. The paper discusses the prototype of vegetated drainage system Glinscica (VDSG) composed of a vege-tated drainage ditch (VDD) and a new river bed with me-anders (RBM) | Pollution Treatment on the Glinščica, Slovenia |
Tolka Valley Greenway opening speech by Lord Mayor | Speech thanking participants and giving site overview | River Tolka constructed wetland and enhancements, Ireland |
kowalewski.htm | An increase of water retention in the programmes of small retention in the country to the year 2015 is estimated at 1141 million m3. It means annual mean increase of retention capacity by c. 60 million m3. Accomplishment of relevant actions in the years 1997†“2007 allowed collecting 57 million m3 in lakes, c. 56 million m3 in artificial reservoirs, 18.5 million m3 in fishponds, c. 10.5 million m3 with the channel retention and over 2 million m3 in other investments. It makes total increase of water retention by 142 million m3 which is 12.4% of target retention and the mean annual increment of c. 13 million m3. The paper presents volumes of retained water, sources and structure of financing, mean unit costs of retention increments and the increase of retention capacity in particular voivodships (acc. to new administration division) in the years 1998†“2007. |
Reconstruction and modernization of existing and construction of new reservoirs and ponds in rural areas of Poland |
Case study:Restoration of Rusenski Lom River near Ivanovo | Application of the principle †œmore space for the river †“ more safety for people† | Floodplain restoration in the Russenski Lom Nature Park, Bulgaria |
Tramos Bajos del Aragon y del Arga | Factsheet filled with data from Natura 2000 data set | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Anejo 4 (Estudio hidrológico e hidraíºlico). | Project Report | Órbigo River ecological status improvement, Spain |
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Reviving Water Wells and Ponds in Cross-Border Area | The project envisages the restoration and arrangement of 32 water wells and ponds as monuments of cultural heritage | Restoration of water wells in the Miren-Kostanjevica Municipality, Slovenia |
"After us, the desert and the deluge" | In a short period of 18 months the villages and towns involved in the Programme carried out about 80 thausand different water retention elments in degraded landscape. | Landscape revitalisation program in Slovakia |
Palienes režima atjaunošana Slampes upes lejtece | Collection of articles about habitat management problematic in Latvia | Floodplain restoration of the river Slampe, Latvia |
Ciobarciu Wetland Pilot Project on ecological Reconstruction | Prezentation of the pilot project at the Final Wetlands Workshop of UNDP/GEF Danube Regional Project | Wetland restoration in Ciobarciu, Romania |
Evaluation report Ciobarciu Wetland | Report presenting the main lessons of the project, especially regarding stakeholder participation. It does so by first giving an introduction to the project and explaining the method of the evaluation (chapter 1). It then goes through the results of the project (chapter 2), following the project†™s objectives as described in the project document and quoted in the introduction (chapter 1) of this report. | Wetland restoration in Ciobarciu, Romania |
Proyecto para la mejora del estado ecológico del río Órbigo. Tramo I (León). Instrucción para la elaboración y tramitación de los informes de viabilidad previstos en el artículo 46.5 de la Ley de Aguas). [Clave: 02.434-229/2111] | Feasibility Report on actions to be implemented within the framework of the National Strategy on River Restoration | Órbigo River ecological status improvement, Spain |
Odense Å ved Brobyværk | De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. | Restoration of the Odense river, Denmark |
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park | Project description; Environmental issues; Beneficiaries; Administrative data | Ecological Restoration of Mata Radeanu, Romania |
Good practices handbook | The INTERREG IVC project WATER CoRe (Water scarcity and droughts; coordinated actions in European regions) provides an exchange platform on water scarcity and drought issues. Due to climate change effects, water scarcity is foreseen to affect the European Union citizens on ecological, economic and social issues, at local and regional level. New and coordinated strategies and policies are required, to mitigate the climate change impact on our economy and our life. Thus, the main objective of the project is the exchange of experiences and the transfer of good practices between the regions partners in the project and the improvement of topic related management standards all around Europe. | Multi-purpose water management development along the Körös-ér, Hungary |
Sutcliffe Park Briefing pack - External | Draft note for external distribution outlining the sitcliffe Park site, key messages | Restoring the River Quaggy in London, UK |
Belford catchment proactive flood soutions: storing and attenuating runoff on farms | This paper represents the hydrological charateristics of the catchment, the design of pilot ponds and initial results | Rural runoff attenuation in the Belford catchment, UK |
Project RMP5455: Slowing the Flow at Pickering, Final Report to Defra, Forest Research | The Project 'Slowing the Flow at Pickering' implements multiple natural flood risk measures including low level bunds, large woody debris dams, planting riparian and floodplain woodland, planting farm woodland, blocking moorland drains and establishing no-burn buffer zones, blocking forest drains and implementing farm-scale measures. The aim of the project is to show how land management measures can help to reduce flood risk from a river in the town and is implemented in close cooperation with local stakeholders. The project involved both the Pickering Beck and adjacent River Seven catchments, the description of measures described below relate to the former. | Slowing the Flow at Pickering, UK |
Case Study: Lippenbroek Regulated Tidal Exchange Scheme | The Lippenbroek Regulated Tidal Exchange (RTE) scheme is a pilot scheme for the so-called controlled reduced tide (CRT) concept which Belgian authorities are planning to apply to (sections of) numerous flood storage areas in the near future to create tidal habitats (e.g. at Kruibeke, where the first inundation will likely occur in 2011). The CRT concept involves the use of two exchange mediums, one high inlet medium (e.g. a weir/spillway or sluice/culvert), and a lower outlet medium, which may be capped with a gravity controlled sluice gate. | Lippenbroek Regulated Tidal Exchange Scheme, Belgium |
A framework for managing runoff and pollution in the rural landscape using a Catchment Systems Engineering approach | Here a framework for applying a CSE approach to the catchment is shownin a step by step guide to implementing mitigation measures in the Belford Burn catchment. The framework is based around engagement with catchment stakeholders. | Rural runoff attenuation in the Belford catchment, UK |
Naturschutzgroßprojekt Lenzener Elbtalaue | Website of the project. | Dyke relocation on the river Elbe near Lenzen, Germany |
DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok N.R. | Restoration was done by improving the lagoon's water circulation, through the removal of sediments, the creation of a new marsh, flooding an area previously used for agriculture and the installation of equipment to control and regulate the inflow and outflow of water. | DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok Nature Reserve, Slovenia |
Natural Park of the Lower Prut Floodplain - Project LIFE 05 NAT/RO /000155 | Description of the project. | Ecological Restoration of Mata Radeanu, Romania |
NEW: final reports for Slowing the Flow at Pickering project | This webpage links to the phase 1 and phase 2 reports of the project. | Slowing the Flow at Pickering, UK |
River Órbigo Restoration Project | Presentation on the project (IRF EUROPEAN RIVERPRIZE FINALIST. September 2013, Vienna, Austria) | Órbigo River ecological status improvement, Spain |
The Tolka catchment - fulfilling multiple roles: local government perspectives | Presentation on Tolka Valley Park, showing ecological measures and effects | River Tolka constructed wetland and enhancements, Ireland |
Directirces y recomendaciones técnicas para la conservacion del vison Europeo y sus hábitats | "Technical recommendations and guidelines for the conservation of the European mink and its habitats" Restoration actions carried out to restore the river habitats of interest to conservation | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Pilootprojecten Stroomgebied Voer | This presentation gives a short graphical overview of two executed NWRM's on the Horstergrub river less than one on the Belgian side of the border, one on the Dutch side of the border. The NWRM on the Belgian side of the border is the discussed NWRM. | Horstergrub sediment management, Belgium |
El Proyecto de mejora ecologica del río Órbigo (tramo I) | Article on the restoration project | Órbigo River ecological status improvement, Spain |
Weigall Road and Sutcliffe park | Site description and details of dimensions of NWRM measures | Restoring the River Quaggy in London, UK |
ES2200035 -Tramos Bajos del Aragon y del Arga | Natura 2000 data set for lower reaches of the Aragon and Arga Rivers | Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain |
Stratégie locale de gestion des risques inondations, territoire à risque important d’inondation d’Annecy | Functional restoration of the valley of Saint Ruph-Glière-Eau Morte | |
Project Nieuwsbrief - Vallei van de Grote Nete | Eén van de hoekstenen van het hedendaagse waterbeleid is het principe ‘vasthouden-bergen-afvoeren’ zoals ook blijkt uit het bekkenbeheerplan. Door water maximaal vast te houden aan de bron of ter plaatse te laten infiltreren, wordt wateroverlast niet langer afgewenteld op stroomafwaarts gelegen gebieden. Diezelfdestrategie moet ook voor een oplossing zorgen in de strijd tegen verdroging die in het licht van een mogelijke klimaatsverandering wel eens belangrijk zou kunnen worden. | Floodplain reconnection in the Vallei van de Grote Nete, Belgium |
National River Flow Archive | Data and catchment characteristics for Pickering Beck gauging station 27056 - Pickering Beck at Ings Bridge | Slowing the Flow at Pickering, UK |