Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Sources

Sector

Current search

  • 174 results found

Sector

  • Hydro Morphology (174)
  • Forest (39)
  • Agriculture (17)
  • Urban (2)

NWRM(s) implemented

  • Floodplain restoration and management (119)
  • Re-meandering (73)
  • Forest riparian buffers (72)
  • Natural bank stabilisation (61)
  • Stream bed re-naturalization (53)
  • Riverbed material renaturalization (40)
  • Elimination of riverbank protection (34)
  • Removal of dams and other longitudinal barriers (32)
  • Meadows and pastures (29)
  • Buffer strips and hedges (27)
  • Lake restoration (24)
  • Reconnection of oxbow lakes and similar features (18)
  • Restoration of natural infiltration to groundwater (17)
  • Green cover (15)
  • No till agriculture (14)
  • Detention Basins (12)
  • Retention Ponds (12)
  • Coarse woody debris (11)
  • Filter Strips (9)
  • Channels and rills (8)
  • Swales (7)
  • Urban forest parks (7)
  • Permeable surfaces (6)
  • Sediment capture ponds (6)
  • Green Roofs (5)
  • Low till agriculture (5)
  • Peak flow control structures (5)
  • Restoration and reconnection of seasonal streams (5)
  • Infiltration basins (4)
  • Maintenance of forest cover in headwater areas (3)
  • Re-naturalisation of polder areas (3)
  • Targeted planting for 'catching' precipitation (3)
  • Rain Gardens (2)
  • Rainwater Harvesting (2)
  • Soakaways (2)
  • Traditional terracing (2)
  • Infiltration Trenches (1)
  • Land use conversion (1)
  • Reduced stocking density (1)
  • (-) Wetland restoration and management (151)
  • (-) Basins and ponds (35)
Title Abstract Case study(ies)
How to facilitate the transfer of wtaer management knowledge
Lessons from Dutch-Romanian project experiences for project implementers, advisors and financers
The booklet presents some of the Dutch experiences with transferring knowledge in
international collaborative water projects. One of teh case studie is the Ciobarciu wetland project and includes data from the evaluation from 2011.
Wetland restoration in Ciobarciu, Romania
BIOMURA - Conservation of biodiversity of the Mura river in Slovenia The bed of the river Mura that flows through NE Slovenia is well preserved, especially in the middle and lower stream, where it is characterised by embankment erosion, deposition of the sand, flooding and side-channels. Deepening of the riverbed due to send accumulation behind the dams of hydropower stations in Austria, however, has resulted in a greater risk of flooding. There are no dams on Slovenian river section, but plans to alter this situation are resurfacing. Conservation of Mura banks, Slovenia
Sigmaplan - Vallei van de Grote Nete In de Vallei van de Grote Nete tussen Nijlen en Geel, krijgt de kronkelende rivier opnieuw meer ruimte, via een combinatie van de aanleg van een winterbedding en gecontroleerde waterbuffergebieden. Dat zijn GOG's zonder ringdijk. De winst is dubbel: de kans op overstromingen is kleiner en geleidelijk kan er weer natte natuur groeien, in de vorm van waardevol wetland.
Floodplain reconnection in the Vallei van de Grote Nete, Belgium
Phone interview Italy Phone interview: Paolo Cornelio is the person in charge of implementing NWRMs in the Consorzio's area of intervention Restructuring the effluent web in Italy
Restoration of Kuresoo Aims of the project were - to find out the current status, develop restoration plan, compile construction project and prepare follow-up project. Restoring the Kuresoo bog, Estonia
Créer une prairie multi-espèce en zone inondable. Fiche technique n°05 Restoration of a natural floodplain meadow in the Quintarets at Isle-Jourdain
Potentiel écologique d’un ouvrage de rétention et de filtration des eaux pluviales sur une opération de 172 hectares (Reims) ; analyse de la genèse du projet A 172 ha town planning project has been developed near Reims (France) for the last five years. For one of the catchments of this area (72ha) a 15 000 m3 detention pond is being built, in a difficult hydrogeological context since ground water level may rise up to the natural ground. Constructed wetland with reed bed filters near Reims, France
Restoring Europe's Rivers - Case Study Ciobarciu Wetland Project Case study pesentation with additional deatails Wetland restoration in Ciobarciu, Romania
Final Report - LIFE06 NAT/SK/000114, Conservation of Senne and Medzibodrozie SPAs in Slovakia This is the Final Report on the project LIFE 06/NAT/SK/000114 Conservation of Senne and Medzibodrozie SPAs in Slovakia. The Report covers the period from 15/11/2005 to 14/05/2011. It ncludes description of the activities undertaken within the project span and evaluation of the project results and impact. Wetland restoration in the Senne and Medzibodrozie SPAs, Slovakia
Biodiversity Survey of the Integrated Constructed Wetland at Tolka Valley Park, Finglas, Co. Dublin Ecological survey River Tolka constructed wetland and enhancements, Ireland
Transferring Water Management Knwoledge
How actors, interaction and context influence the effectiveness of Dutch-funded project in Romania
Thesis as a result of the collaboratiion of the
Faculty of Engineering Technology, Department
of Water Engineering and Ma nagement (www.utwente.nl/ctw/wem/) and the School of
Management and Governance, CSTM: Twente Centre for Studies in Technology andSustainable Development (www.utwente.nl/mb/cstm/). Reflection and discussion part includes also the Ciobarciu case study
Wetland restoration in Ciobarciu, Romania
River Basin Management Plan Prut-Barlad General presentation of the basin, Characterization, Identification of the protected areas, Monitoring, Environmenatl objectives, Economic analysis, programme of Measures, etc. Wetland restoration in Ciobarciu, Romania
Case study:The Babina Restoration Project Until the 20th century vast areas of the Danube Delta faced only minimal human impacts through extensive fishery and reed harvesting. Since then the Danube Delta has undergone multiple human impacts like embankment, channelization and drainage. Moreover, large areas were diked and the polders used for agriculture. The Babina polder (2.100 ha) was reconnected to the Danube in 1994 and recovery has been monitored by the Danube Delta National Institute for Research and Development. Within a few years a redevelopment of the site-specific biodiversity occurred and ecosystem services like nutrient retention and fish recruitment became obvious. Additionally, the reconnected polder enable reed harvesting, grazing, fishing and ecotourism. Babina Restoration Project, Romania
REVITALIZATION OF THE CLIMATE IN DRIED - OUT COMMUNITIES IN SLOVAKIA VIA HYDRO - CLIMATE RECOVERY Recovery of the climate and landscape via integrated rainwater retention in the damaged parts of the country utilizing water retention measures (small dams, retention ponds, rainwater gardens, re-cultivated logging roads) Recovery of dried out communities in Slovakia
Erfolgreiche Feuchtgrünlandentwicklung durch Naturschutzmaßnahmen. Langfristige Veränderung von Flora, Vegetation und Avifauna am Beispiel des Ochsenmoores in der Dümmerniederung. NLWKN website Restoration of Wetlands in the Western Lowland Area of the Dümmer Lake, Germany
Run-off treatment of highly fluctuating waters with subsurface vegetated drainage ditch and river bed with meanders Current research suggests using vegetated drainage ditch as an additional practice in the mitigation of surface water pollution. The paper discusses the prototype of vegetated drainage system Glinscica (VDSG) composed of a vege-tated drainage ditch (VDD) and a new river bed with me-anders (RBM) Pollution Treatment on the Glinščica, Slovenia
Ecoremediation of degraded soils and sediments Advantages of ecoremendiation of degraded soils and contaminated sediments LIMNOTOP: Eco-remediation near Ormoz, Slovenia
Tolka Valley Greenway opening speech by Lord Mayor Speech thanking participants and giving site overview River Tolka constructed wetland and enhancements, Ireland
Preparation of a Management Plan for the Oroklini Lake (in Greek) The ecological, socioeconomic, human activities, land use, biotic and abiotic characteristics, flora and fauna and dangers are assessed. A Management Plan of the area †œOroklini Lake† under the NATURA (CY 6000011) and a monitoring plan is developed. Oroklini wetland restoration in Cyprus
The Danube Delta Biosphere Reserve The presentation on Danube Delta Fortuna Restoration Project in the Danube Delta, Romania
kowalewski.htm An increase of water retention in the programmes of small retention in the country to the
year 2015 is estimated at 1141 million m3. It means annual mean increase of retention capacity by
c. 60 million m3. Accomplishment of relevant actions in the years 1997†“2007 allowed collecting
57 million m3 in lakes, c. 56 million m3 in artificial reservoirs, 18.5 million m3 in fishponds, c. 10.5
million m3 with the channel retention and over 2 million m3 in other investments. It makes total increase
of water retention by 142 million m3 which is 12.4% of target retention and the mean annual
increment of c. 13 million m3.
The paper presents volumes of retained water, sources and structure of financing, mean unit costs
of retention increments and the increase of retention capacity in particular voivodships (acc. to new
administration division) in the years 1998†“2007.
Reconstruction and modernization of existing and construction of new reservoirs and ponds in rural areas of Poland
Constructed Wetlands Sustainable Wastewater Treatment for Rural and Peri-Urban Communities in Bulgaria Constructed wetland (tank for pre-treatment and planted soilfileter for the biological step) for the treatment of domestic wastewater as decentralised solution Constructed wetland in Vidrare, Bulgaria
Tramos Bajos del Aragon y del Arga Factsheet filled with data from Natura 2000 data set Fluvial and ecosystem restoration of the Arga-Aragon Rivers, Spain
Romanian Danube Delta Biodiversity Project Local Benefits The project intended to protect the Romanian Danube Delta ecosystem, contribute to the conservation of biodiversity in the Delta, strengthening the capacity of the Danube Delta Biodiversity Reserve Authority (DDBRA) and the Danube Delta National Institute (DDNI). Fortuna Restoration Project in the Danube Delta, Romania
Conservation of Senne and Medzibrodozie SPAs in Slovakia LIFE06 NAT/SK/000114 The centre of the Special Protected Area which is 2703 ha, is a fish pond system. It involves 26 production ponds and one non-commercial as a part of the National Nature Reserve (NNR), 213,31 ha with buffer zone of 211,28 ha. The total fish pond area is about 700 ha. Within the NNR three bird islands are important breeding sites of Night Herons, Little Egrets and Cormorants. In reedbeds other birds like grebes, coot, rails, ducks, swans, herons, harriers ect. are found. In July 1990 the area was involved in Ramsar sites with an international importance. Wetland restoration in the Senne and Medzibodrozie SPAs, Slovakia
Restauration hydromorphologique des bassins de l’Eau Morte et du ruisseau de Montmin à l’amont des secteurs vulnérables de Sollier-La Reisse-Verthier : la recherche de solutions de gestion des risques d’inondations co-construites avec les habitants. Functional restoration of the valley of Saint Ruph-Glière-Eau Morte
Reviving Water Wells and Ponds in Cross-Border Area The project envisages the restoration and arrangement of 32 water wells and ponds as monuments of cultural heritage Restoration of water wells in the Miren-Kostanjevica Municipality, Slovenia
"After us, the desert and the deluge" In a short period of 18 months the villages and towns involved in the Programme carried out about 80 thausand different water retention elments in degraded landscape. Landscape revitalisation program in Slovakia
LiveDrava - layman's report This is the layman's report: a short illustrated summary of this restoration project Riparian Ecosystem Restoration of the Lower Drava River in
Slovenia, financed by Life+ programme, coordinated by DOPPS Birdlife Slovenia
LiveDrava - Riparian Ecosystem Restoration of the Lower Drava River in Slovenia
Restauration d’une tourbière à Gentioux Restoration of the Gentioux peat bog by clearing and aerial skidding
Interventi estesi di riqualificazione fluviale lungo gli affluenti del medio corso del Fiume Dese The Veneto Region, through the †œPlan for diffuse pollution prevention and restoration of water in the draining basins of the Venice Lagoon† financed measures of re-calibration of riverbeds aimed at the renaturation of the hydraulic web, to increase the time of permanence of water and phytodepuration processes in the draining basin.
In this framework, the Consorzio Acque Risorgive implemented a series of extended interventions on the area under its responsibility.
This case study was implemented as part of these interventions.
In particular, it aimed at re-structuring the effluents of the mid course of the Dese river (Rio S. Martino, Rio S. Ambrogio and Scolo Desolino). Such effluents are mostly draining channels, draining water from agricultural fields to the Dese river. The primary objective was the reduction of the amount of N and P reaching the Venice lagoon through phytodepuration. However, at the same time the project carried out the restoration of the draining channel web aimed at reducing flooding issues affecting the area.
The following measures were implemented:
†¢ Riparian buffer zones
†¢ Creation of wetlands
†¢ River bed enlargement
†¢ Creation and reconnection of floodplain and new buffer strips
†¢ Channel naturalization, creation of new meandering channel
Restructuring the effluent web in Italy
Danube birds conservation - Conservation of Endangered Bird Species Populations in Natural Habitats of the Danube Inland Delta The general objective is to improve the conservation status of the floodplain bird species that are protected in the Natura 2000 sites SPA Dunajské luhy (Slovakia) and SPA Szigetkoz (Hungary). The specific objectives of the project are to:
-Restore selected wetlands, dried-up river branches and oxbows;
-Restore river branch connectivity, water regime and flowing water conditions;
-Lease or purchase land following the introduction of appropriate habitat management;
-Eliminate fish migration barriers at two strategic points and restore birds†™ food base;
-Restore abandoned meadows as feeding and nesting bird habitats;
-Restore birds†™ refuges and nesting areas by planting native tree species;
-Implement measures preventing unintentional and/or illegal disturbance of the target bird species populations;
-Acquire relevant scientific data on target species and their habitats;
-Raise awareness among key stakeholders and the public;
-Implement additional measures that will make the habitats of target species more attractive for them (e.g. creation of appropriate breeding possibilities).
Wetland restoration and remeandering in SPA Dunajské luhy (Slovakia) and SPA Szigetkoz (Hungary)
Ciobarciu Wetland Pilot Project on ecological Reconstruction Prezentation of the pilot project at the Final Wetlands Workshop of UNDP/GEF Danube Regional Project Wetland restoration in Ciobarciu, Romania
Evaluation report Ciobarciu Wetland Report presenting the main lessons of the project, especially regarding stakeholder participation. It does so by first giving an introduction to the project and explaining the method of the evaluation (chapter 1). It then goes through the results of the project (chapter 2), following the project†™s objectives as described in the project document and quoted in the introduction (chapter 1) of this report. Wetland restoration in Ciobarciu, Romania
Notranjski regijski park, Layman's Report Layman's Report (project report intended for wider public) presents background, goals and purpose of the project, planned solutions, actions and result. At the end it describes the meaning and the message of the project. Conservation on Lake Cerknica, Slovenia
Odense Å ved Brobyværk De fleste af vores vandløb er i større eller mindre grad reguleret af menneskets hånd. Denne strækning af Odense Å og Tørring Bæk blev i årene 1944-1950 udrettet og forkortet med 2200 m på en 11,2 km lang strækning. I den forbindelse fik åen et bredt, trapezformet forløb, der lå op til 1,2 m dybere end det tidligere forløb. Udløbet fra Tørring Bæk til Odense Å blev samtidigt flyttet. Arealerne op til åen var desuden drænede for at sikre landbrugsdriften. Restoration of the Odense river, Denmark
Review of the Exmoor Mires Restoration Project
Final Report
The Exmoor Mire Restoration Project (EMRP) 2006-2010 aimed to restore the natural
hydrology of degraded blanket bogs on Exmoor by blocking up the network of old drainage
ditches. This project will shortly finish and funding has been secured from South West
Water for a new and larger †˜Mires on the Moors†™ project which could potentially rewet up to
2,500 hectares of peatland on Exmoor. The EMRP Steering Group commissioned the
Countryside and Community Research Institute (CCRI) to undertake an external and
independent review of peatland restoration work on Exmoor to help guide future activity.
The two main aims of the review were:
i) to conduct a review of peatland restoration on Exmoor to date; and
ii) to give guidance to the Steering Group on how best to proceed with peatland restoration,
while furthering National Park purposes, and having regard to the economic and social well
being of the local community.
Exmoor Mires peatland restoration, UK
Méthode standard d'analyse de la qualité de l'habitat aquatique à l'échelle de la station : l’IAM Restoration of the Gentioux peat bog by clearing and aerial skidding
Restauration des prairies humides le long de l'Ernz Blanche entre Altinster et Larochette Feasibility study of a re-meandring project of the Ernz Blanche river. Restoration of the Ernz Blanche river, Luxemburg
Belford catchment proactive flood soutions: storing and attenuating runoff on farms This paper represents the hydrological charateristics of the catchment, the design of pilot ponds and initial results Rural runoff attenuation in the Belford catchment, UK
Project RMP5455: Slowing the Flow at Pickering, Final Report to Defra, Forest Research The Project 'Slowing the Flow at Pickering' implements multiple natural flood risk measures including low level bunds, large woody debris dams, planting riparian and floodplain woodland, planting farm woodland, blocking moorland drains and establishing no-burn buffer zones, blocking forest drains and implementing farm-scale measures. The aim of the project is to show how land management measures can help to reduce flood risk from a river in the town and is implemented in close cooperation with local stakeholders. The project involved both the Pickering Beck and adjacent River Seven catchments, the description of measures described below relate to the former. Slowing the Flow at Pickering, UK
A framework for managing runoff and pollution in the rural landscape using a Catchment Systems Engineering approach Here a framework for applying a CSE approach to the catchment is shownin a step by step guide to implementing mitigation measures in the Belford Burn catchment. The framework is based around engagement with catchment stakeholders. Rural runoff attenuation in the Belford catchment, UK
Bodrog demonstration Project - Component 2 - UNDP/GEF Tisza MSP - Making space for water in the Bodrog River Basin Reconstruction of the existing floodgate in confluence of dying bypass channel with Ziarovnicky stream and its ensuring to supply wetlands by water during the dry period and in case of flood events to facilitate the elimination of flood impact on this territory. Floodgate reconstruction, Slovakia
Effect of meander restoration on macroinvertebratebiodiversity: the case of the Borová stream(Blanskí½ Les, Czech Republic) This study brings a view on the effects of restoration of a formerly channelized small submontane stream situated in the Blanský Les Protected Landscape Area (South Bohemia, Czech Republic) on macroinvertebrate assemblages as an indicator group. The restoration project was carried out during two stages (1998 and 2000). It consisted of excavating a new channel to restore the historic meandering pattern. The evaluation of this project is primarily based on the comparison of composition between pre-restoration (1995) and post-restoration (2000–2003) macroinvertebrate samples focusing on species richness, species composition, and representation of rare Ephemeroptera and Plecoptera species. The analyses showed a substantial increase in species richness that was especially prominent shortly after the restoration intervention. This increase was not only due to the creation of lentic habitats, but was even observed at every single sampling site of the stream. The DCA ordination of species composition of the pre- and post-restoration sites indicated a considerable increase in the between-site diversity. This was apparently caused mainly by the establishing of lentic habitats, whereas diversity of lotic sites showed only a slight increase, which was most prominent during the last year of the sampling period. The shift in the species composition was profound for lotic sites as well. Although the restoration intervention considerably increased species richness and markedly changed species composition, there was no detectable increase of rare or vulnerable Ephemeroptera and Plecoptera species. Revitalisation of the Borova stream, Czech Republic
Komplex élőhelyrehabilitációs tevékenység az Րrségi Nemzeti Park Igazgatóság működési területén.Complex habitat reconstruction in the Րrség National Park There are three measures applied in the national park area primarily for nature rehabilitation, but all measures have water retention aspects. (1) Creating ponds in the forest where run off from forestry roads are collected. The main goal is to create safe breeding ground for reptiles instead of temporary sumps on the roads. 50 ponds created with the total surface 1,100m2.
(2) Re-vegetating shelterbelts (groves, wetlands) in agricultural land where 50 years ago these landscape elements were destroyed for agro efficiency reasons. 12 areas of revegetation, their total cover 12,000m2 in an area of 153 ha. (3) Building closures in the drainage channels to enable the flooding of the alder (Alnus) forest and wet meadow to improve their natural quality an important site in the ecological corridor along the stream Csörnöc. The drainage channel's watershed is 42 ha.
Diverse Habitat Reconstructions in the Őrség National Park in Hungary
DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok N.R. Restoration was done by improving the lagoon's water circulation, through the removal of sediments, the creation of a new marsh, flooding an area previously used for agriculture and the installation of equipment to control and regulate the inflow and outflow of water. DOPPS - Restoring and conserving habitats and birds in Skocjanski Zatok Nature Reserve, Slovenia
NEW: final reports for Slowing the Flow at Pickering project This webpage links to the phase 1 and phase 2 reports of the project. Slowing the Flow at Pickering, UK
UK Soil Observatory Soil maps viewer Exmoor Mires peatland restoration, UK
The Tolka catchment - fulfilling multiple roles: local government perspectives Presentation on Tolka Valley Park, showing ecological measures and effects River Tolka constructed wetland and enhancements, Ireland
GreenBorders LIFE Nature project "Transboundary conservation of the Phalacrocorax pygmaeus and Aythya nyroca in Romanian and Bulgarian key sites"; Objectives: is to ensure living conditions for the two species by: nesting and feeding areas' reconstruction; implementing the best practices for fisheries management; Green Borders: Transboundary conservation activities in Romania and Bulgaria

Pagination

  • Previous page ‹‹
  • Next page ››

Funded by EU
Service contract funded by the European Commission((Directorate General Environment))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau | Join the NWRM group on Join us in Linked In

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18